A and b can do a piece of work in 12 days. If a alone have to finish the job among b and c so
A and b=12
A (24 days alone without b)
So if b and c 15 days and c 20 days. If a have to do all I would add 24 and 15 and 20 which would be 59 days
The answer is to call me quick
Answer: 1.0/5. 7.
Step-by-step explanation:
((square root of -->>(VOLUME)/(PIE)X(HEIGHT)) should equal (r).
Answer:
8
Step-by-step explanation:
i used the calculator