I’m pretty sure the answer is 8 inches :) mark as brainleist pls
The area is 123.1073415 cm
Answer:
It will take a total of 2.73 hours if they worked together
Step-by-step explanation:
Here, we are seeking to calculate the joint rate.
Let the amount of work to be done is say x
Seth’s rate will be x/6 , while violet’s rate will be x/5
Their joint rate will be ;
x/6 + x/5 = 11x/30
The time it will take them to build the house together will be equal to the amount of work divided by the joint rate.
That will be x divided by 11x/30
= x * 30/11x
= 30/11 hours which is Approximately 2.73 hours
Answer:
t = ln(0.5)/-r
Step-by-step explanation:
The decay rate parameter is missing. I will assume a value of 4% per day.
The exponential decay is modeled by the following equation:
A = A0*e^(-r*t)
where A is the mass after t time (in days), A0 is the initial mass and r is the rate (as a decimal).
At half-life A = A0/2, then:
A0/2 = A0*e^(-0.04*t)
0.5 = e^(-0.04*t)
ln(0.5) = -0.04*t
t = ln(0.5)/-0.04
t = 17.33 days
In general the half-life time is:
t = ln(0.5)/-r
Answer:Simple volume equation: V=bwh
b=36, w=20, h=4
Just multiply them together to get 2,880.
So the answer is 2,880 cubic feet of water
Hope this helped :)
Step-by-step explanation: