Answer:
0.16/8.5
Step-by-step explanation:
so to get the slope use (Y2-Y1) over (X2-X1)
this means that the formula is
1/2-1/3
---------
25.5- 17
I’m pretty sure the answer is 127.48 ,but I could be wrong.
The best estimate for this correlation would be B) 0.9.
We can see that the number is constantly going up, which would throw out the D answer.
We can also see that for every time the x goes up 1, the y goes up a little less than one. We can see that in the ordered pairs that exist on the graph such as (3, 2), (8, 6) and (2.1, 1.9).
Since the y values are just lower than the x, the correlation would be just under one. Therefore, 0.9 is an accurate estimation.
He bikes 4/10 of a mile in 1/5 of an hour
That is 4/10 miles in 1/5 hours
Average speed = Distance/ time = 4/10 ÷ 1/5 = 4/10 × 5/1 = 2 miles/hour
Answer:
42
Step-by-step explanation:
105 - 63 = 42