Well since there is 12 months in a year you would multiply 35 by 12, so the answer is 420
Step-by-step explanation:
Since



The function has a constant factor so we have a exponential function.
The equation of a exponential function is

Where a is the initial value and b is the growth factor
The growth factor is 3/2,
The initial value in 32

Plug in 4 for x.
You will get 162
Plug in 5 for x you will get
243.
2013- 162
2014- 243
Answer:
There are many ways to show it like-
Step-by-step explanation:
2/5 as it’s already shown, or you can use 2 divide by 5, many people use 2[5] that’s the ways they showed my in my school idk if its different for you
Answer:
- The solution that optimizes the profit is producing 0 small lifts and 50 large lifts.
- Below are all the steps explained in detail.
Explanation:
<u />
<u>1. Name the variables:</u>
- x: number of smaller lifts
- y: number of larger lifts
<u></u>
<u>2. Build a table to determine the number of hours each lift requires from each department:</u>
<u></u>
Number of hours
small lift large lift total per department
Welding department 1x 3y x + 3y
Packaging department 2x 1y 2x + y
<u></u>
<u>3. Constraints</u>
- 150 hours available in welding: x + 3y ≤ 150
- 120 hours available in packaging: 2x + y ≤ 120
- The variables cannot be negative: x ≥ 0, and y ≥ 0
Then you must:
- draw the lines and regions defined by each constraint
- determine the region of solution that satisfies all the constraints
- determine the vertices of the solution region
- test the profit function for each of the vertices. The vertex that gives the greatest profit is the solution (the number of each tupe that should be produced to maximize profits)
<u></u>
<u>4. Graph</u>
See the graph attached.
Here is how you draw it.
- x + 3y ≤ 150
- draw the line x + 3y = 150 (a solid line because it is included in the solution set)
- shade the region below and to the left of the line
- 2x + y ≤ 120
- draw the line 2x + y ≤ 120 (a solid line because it is included in the solution set)
- shade the region below and to the left of the line
- x ≥ 0 and y ≥ 0: means that only the first quadrant is considered
- the solution region is the intersection of the regions described above.
- take the points that are vertices inside the solutoin region.
<u>5. Test the profit function for each vertex</u>
The profit function is P(x,y) = 25x + 90y
The vertices shown in the graph are:
The profits with the vertices are:
- P(0,0) = 0
- P(0,50) = 25(0) + 90(50) = 4,500
- P(42,36) = 25(42) + 90(36) = 4,290
- P(60,0) = 25(60) + 90(0) = 1,500
Thus, the solution that optimizes the profit is producing 0 smaller lifts and 90 larger lifts.