Correct answer is the 3rd one.
180-110=70
180-(70+59)=180-129=51
Z=51 im p sure
Answer:

Step-by-step explanation:
We are given that The monthly charge for a waste collection service is 1830 dollars for 100 kg of waste
So, 
We are also given that The monthly charge for a waste collection service is 2460 dollars for 135 kg of waste.
So, 
We are supposed to find a linear model for the cost, C, of waste collection as a function of the number of kilograms, w.
So, we will use two point slope form :
Formula : 
Substitute the values





y denotes the cost
x denotes the weight
So, Replace y with C and x with w

So, a linear model for the cost, C, of waste collection as a function of the number of kilograms, w is 
Answer:
It would be 8 PM.
Step-by-step explanation:
If you keep decreasing 23 by 7 till you get to -5, it would have to be decreased 4 times to get to -5. This means that the time would have to go up 4 times the 45 minute rate, which would be 3 hours. 5 pm + 3 hours is 8 PM.
Answer: 9 students
Step-by-step explanation:
15+8+3=26
35-26= 9