Excuse my awful triangle drawing skills, haha..
So essentially you need to find the perimeter which is done by adding the lengths of the sides.. this gives you 22ft.
Then for part b you need to convert 22ft to yards which gives you 7.3 yards.
Since you can only buy a whole number of yards, you'll actually need 8 yards.
So if the boarder is $8.75 per yard, and you need 8 yards, how much would it cost?
Hope this was helpful.
<h3>
Answer: 5</h3>
Explanation:
This is something you could do by trial and error.
The visible numbers are 1,2,3,4,6 which multiply to 144.
Another approach is to notice that 5 is not a factor of 144, so it must be the hidden value not part of the items multiplied.
Every other number 1,2,3,4,6 is a factor of 144.
1*144 = 144
2*72 = 144
3*48 = 144
4*36 = 144
6*24 = 144
To find the standard error, divide the standard deviation by the square root of the sample size
standard deviation = 7.5
sample size = 25......sqrt 25 = 5
standard error = 7.5 / 5 = 1.5 <==
Short leg = x-6m
Longer leg =x
Hypotenuse = x+6m
x² + (x-6)² =(x+6)²
x² + x²-12x+36 = x²+12x+36
2x²-12x+36= x² +12x+36
2x²-12x+36-36= x² +12x+36-36
2x² - 12x-12x = x²+12x-12x
2x² -24x-x² = x²-x²
x² -24x = 0
x(x-24)=0
x = 24
Short leg = 24-6m = 18
Longer leg =24
Hypotenuse = 24+6m=30
Check
a² + b² = c²
18² +24² =30²
324 +576 = 900
900=900