Answer:
The sample required is 
Step-by-step explanation:
From the question we are told that
The standard deviation is 
The margin of error is 
Given that the confidence level is 99% then the level of significance is mathematically evaluated as



Next we will obtain the critical value
from the normal distribution table(reference math dot armstrong dot edu) , the value is

The sample size is mathematically represented as
![n = [ \frac{Z_{\frac{\alpha }{2} } * \sigma }{E} ]^2](https://tex.z-dn.net/?f=n%20%3D%20%5B%20%5Cfrac%7BZ_%7B%5Cfrac%7B%5Calpha%20%7D%7B2%7D%20%7D%20%2A%20%20%5Csigma%20%7D%7BE%7D%20%5D%5E2)
substituting values
![n = [ \frac{ 2.58 * 9 }{2} ]^2](https://tex.z-dn.net/?f=n%20%3D%20%5B%20%5Cfrac%7B%202.58%20%2A%20%209%20%7D%7B2%7D%20%5D%5E2)

B; if P equals one they would ha. have to divided it by 10 so do that to 4.3 and you would get 0.43
Since 1 ton is 2,000 lbs, each Crib Jack can life 30,000 lbs. It's going to take 2 Crib Jacks, because the extra 5,000 lbs in belongings were removed, leaving the house at a weight of 60,000 lbs.