1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Alekssandra [29.7K]
3 years ago
13

In a network, multiple critical paths can occur. true or false

Computers and Technology
2 answers:
Ivanshal [37]3 years ago
4 0
This can be the result of multiple dependencies between tasks, or separate sequences that run for the same duration. TRUE
vitfil [10]3 years ago
3 0

Answer:

I think it's True but I'm not sure

Explanation:

I hope it's help u

You might be interested in
In a newspaper advertisement for a hybrid car, which of these presentation methods would be most effective
faltersainse [42]
Your answer is a....
6 0
3 years ago
Read 2 more answers
Consider the following code:
pishuonlain [190]

In python the % operator is modulo. Modulo returns the remainder of two numbers.

19 % 5 = 4 therefore,

print(x%y) would output 4

7 0
3 years ago
Explain Software licensing
lbvjy [14]

Answer:

Software Licensing is pretty much allowing another company to use your own product.

Explanation:

<u>For Example:</u>

<u>Company A</u> is working on a face swap application which requires a facial recognition software in order to work. They can either build one from scratch (which can take months) or they can pay someone who already has one in order to be able to use it.

<u>Company B</u> owns a facial recognition software and are asked by Company A to license their software to them. Company A pays Company B, they then draft up a contract for Company A allowing them to use the facial recognition app.

Software licenses are either proprietary, free, or open source. Proprietary is the one used in the example above.

I hope this answered your question. If you have any more questions feel free to ask away at Brainly.

5 0
3 years ago
Which option is NOT in the Link to portion of the Insert Hyperlink dialog box?
WARRIOR [948]
Existing file or webpage
4 0
4 years ago
Read 2 more answers
To locate all the documents in a Mongo database that match an expression, use the _____________ method.
Lena [83]

Answer:

find()

Explanation:

When dealing with MongoDB the method that needs to be used in this scenario would be the find() method. This method basically returns all of the records that exist in the collection on which it is called, if no parameter is passed. If you pass a parameter/expression then only the records that match completely the expression will be returned to the user, otherwise nothing is returned. For example, on a database (db) we would call the following

db.find() ... This will return all records

db.find({specific}) ... This will return only the records that match specific.

4 0
3 years ago
Other questions:
  • 50 pts
    12·2 answers
  • Page _____ refers to whether a page is laid out vertically or horizontally.
    12·1 answer
  • What’s a sign you should talk to an adult about your online time
    14·2 answers
  • A copy of the copyrighted work must be exactly the same as the original to infringe a copyright.
    9·1 answer
  • DNA structure can be described as a twisted ladder. Imagine you are climbing a model of DNA, just as if you were climbing a ladd
    10·2 answers
  • Type in computer code for Sonic the Hedgehog, does it look weird yes or no
    15·1 answer
  • What is the example of HTML?​
    13·1 answer
  • Education leads to higher wages lower unemployment.* True or false
    5·1 answer
  • The ___________ method returns the length of an array.
    11·2 answers
  • 10011÷11 binary division​
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!