2x+x-7+3x-20=87cm
6x-27=87
6x=114
x=19
Therefore the sides are:12cm, 38cm, and 37cm
The data point is 1.6 standard deviations above the mean.
Step-by-step explanation:
Z-score
It is the number of standard deviations from the mean that a data point is. It's a measure of how many standard deviations below or above the population mean a raw score is.
A Z-score is also known as a standard score and it can be placed on a normal distribution curve.
As in this case the Z-score is +1.6, so it means the data point is 1.6 standard deviations above the mean. Hope this helps I am kinda knew to this so I hope I helped you
Answer:
Probability would be 8/18 or 4.44%
Step-by-step explanation:
If its spun twice it acts as if it has 18 sections meaning you multiply the number of reds and number of squares total by two in this situation and put them over each other!
Answer:
y = 2.5x + 33.4, y = 75.9 miles
Step-by-step explanation:
Equation is y = 2.5x + 33.4
17 = 2.5 x + 33.4
y = 2.5 (17) + 33.4
y = 42.5 + 33.4
y = 75.9 miles
Answer:
a) the probability of winning A and B is 0.4 (40%)
b) the probability of not winning either project is 0.1 (10%)
Step-by-step explanation:
if 2 events are independent then
P(A∩B)=P(A)*P(B)
where
P(A)= probability of winning project A
P(B)= probability of winning project B
P(A∩B)= probability of winning projects A and B
replacing values
P(A∩B)=P(A)*P(B) = 0.50 * 0.8 = 0.4
b) since
P(A∪B) = P(A) + P(B) - P(A∩B) = 0.50 + 0.8 - 0.4 = 0.9
where
P(A∪B) = probability of winning A or B
therefore
probability of not winning either project = 1 - P(A∪B) = 1 - 0.9 = 0.1 (10%)