1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
seropon [69]
3 years ago
8

Needs help with questions i math

Mathematics
2 answers:
maksim [4K]3 years ago
8 0

Answer:

What is the question?

Step-by-step explanation:

n200080 [17]3 years ago
3 0

Answer:

what is the question

Step-by-step explanation:

You might be interested in
PLEASE Answer I WILL MARK You BRAINLIST if you show your work
N76 [4]
The answer is 8 because if you look she made $40 in 5 hours. $40 divided by 5 is 8. Also she made $80 in 10 hours. 80 divided by 10 is 8!!
3 0
3 years ago
Zapisz w postaci jednej potęgi (zapisz obliczenia):
crimeas [40]

Answer:

1. 62,3

2. 0,000129230769

3. 53424

4. 257027760

5. 382,081081

6. ?

7. 261,6

8. ?

9. 45,15

5 0
2 years ago
Light travels about 168,000 mi/s. The function d(t) = 168,000t gives the distance d(t) in miles that light travels in t seconds.
Yuliya22 [10]

Answer:

The nuclear utility environment is one of strict cost control under prescriptive regulations and increasing public scrutiny. This paper presents the results of A Total Quality approach, by a dedicated team, that addresses the need for increased on-site spent fuel storage in this environment. Innovations to spent fuel pool reracking, driven by utilities' specific technical needs and shrinking budgets, have resulted in both product improvements and lower prices. A Total Quality approach to the entire turnkey project is taken, thereby creating synergism and process efficiency in each of the major phases of the project: design and analysis, licensing, fabrication, installation and disposal. Specific technical advances and the proven quality of the team members minimizes risk to the utility and its shareholders and provides a complete, cost effective service. Proper evaluation of spent fuel storage methods and vendors requires a full understanding of currently available customer driven initiatives that reduce cost while improving quality. In all phases of a spent fuel reracking project, from new rack design and analysis through old rack disposal, the integration of diverse experts, at all levels and throughout all phases of a reracking project, better serves utility needs. This Total Quality environment in conjunction with many technical improvements results in a higher quality product at a lower cost

The prediction of minor actinides amounts accumulated in the spent fuel in China

International Nuclear Information System (INIS)

Zhou Peide

2000-01-01

The amounts of the Minor Actinides accumulated in the spent fuel are predicted according to the Nuclear Power Plant development plan envisaged in China. The Minor Actinides generated in the spent fuel unloaded from a typical PWR per year are calculated. The decay characteristics of the Minor Actinides during storage and cooling period are also calculated. At last, the Minor Actinides amounts accumulated in all spent fuel which were unloaded before sometime are given

8 0
3 years ago
What is the sum of 1.15 times 0.15?
Makovka662 [10]

Answer:

0.1725

Step-by-step explanation:

7 0
3 years ago
Read 2 more answers
26....a right pyramid on a base 4cm square has a slant edge of 6cm.calculate the volume of the pyramid​
jenyasd209 [6]
A right pyramid on a base 4cm square has a slant edge of 6cm the volume
8 0
2 years ago
Other questions:
  • It takes Joaquin 1/5 hour to hike 1/4 mile. What is Joaquin's unit rate, in miles per hour?
    9·1 answer
  • Nhich equation results from taking the square root of both sides of (x+9)2=25
    13·1 answer
  • The function f(x) = 3,267(1 + 0.02)* represents the amount of money in a savings account where x represents time in years. What
    14·2 answers
  • The weight of mr nazeer is 7 times that of his son. What's the ratio of their weights?
    7·1 answer
  • What is the length of BC?<br><br> 18<br> 24<br> 20<br> 22
    11·2 answers
  • Dividing and Multiplying functions
    15·1 answer
  • When solving negative one over five (x − 25) = 7, what is the correct sequence of operations?
    8·1 answer
  • List the number of line segments<br> that have a posilive slope,<br> negative slope, zero slope
    6·1 answer
  • 7. Find the rate of change from the table.
    13·1 answer
  • A bike cost 129.90 what is your total with a tax of 5%
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!