We do a little trolling lol ecks dee

Engineering
2 answers:
IgorLugansk [536]3 years ago
6 0
Reeeeeeeeeeeeeeeeeeeeeeeeeeee
amid [387]3 years ago
3 0

Answer:

among us

Explanation:

*when the imposter is sus*

You might be interested in
What are 4 activities that you do in your daily life that DO require energy?
SashulF [63]

Answer: Some activities that I do in my daily life that require energy are:

1. Doing ballet

2. Studying

3. Walking up and down stairs

4. Stretching

5. Running on the treadmill

Hope this helps!  :)

Explanation:

4 0
3 years ago
Technician A says it will save you money if you get a high interest rate from a bank on the loan. Technician B says it is always
zubka84 [21]
Is there a other option
5 0
3 years ago
The ingredient weights for making 1 yd (cyd) of concrete by assuming aggregates in SSD state are given below. The volume of air
Pachacha [2.7K]

Answer:

Explanation:

Ans) Given batch weight of each component :

Cement = 700 lb

Water = 315 lb

Coarse aggregate = 1575 lb

Fine aggregate = 1100 lb

Part 1) Amount of water = 328.5 lb

Amount of water is needed to be increased if the aggregates has absorption capacity, To maintain constant water cement ratio, the mixing water is increased because some of the water is absorbed by aggregates.

Amount of water absorbed = 328.5 lb - 315 lb = 13.5 lb

Total amount of aggregates = 1575 + 1100 = 2675 lb

=> % Absorption capacity = 13.5 x 100 / 2675 = 0.5 %

Hence, new amount of Coarse aggregate = (1 - 0.005) x 1575 lb = 1567.125 lb

New amount of fine aggregate = (1 - 0.005) x 1100 = 1094.5 lb

Since, water cement ratio is maintained constant , amount of cement remains unchanged

=> Volume of water = 328.5 / 62.4 = 5.26 ft3

=> Volume of cement = 700 / (3.15 x 62.4) = 3.56 ft3

=> Volume of coarse aggregate = 1567.125 / (2.4 x 62.4) = 10.46 ft3

=> Volume of fine aggregate = 1100 / (2.4 x 62.4) = 7.34 ft3

Volume of air = 2% = 0.02 x 27 = 0.54 ft3

Total concrete volume = 5.26 + 3.56 + 10.46 + 7.34 + 0.54 \approx 27 ft3 = 1 yd3

Hence, calculated amount of each component is correct

Part 2) We know, minus sign indicated that the aggregate will absorb some moisture from concrete, hence mixing water amount needed to be corrected .

=> Amount of water absorbed by coarse aggregate = 0.01 x 1567.125 lb = 15.67 lb

=> Amount of water absorbed by fine aggregate = 0.02 x 1094.50 lb = 21.89 lb

Total amount of water absorbed = 15.67 + 21.89 = 37.56 lb

To maintain same water cement ratio, amount of mixing water is needed to be increased

=> Corrected amount of mixing water = 328.5 lb + 37.56 lb = 366 lb

=> Corrected amount of coarse aggregate = (1 - 0.01) x 1567.125 = 1551.45 lb

=> Corrected amount of fine aggregate = (1 - 0.02) x 1094.5 = 1072.6 lb

Part 3) We know,

Unit weight = Sum of weight of each material / Total volume

=> Sum of weight = 366 + 700 + 1551.45 + 1072.6 = 3690.05 lb

Total volume = 1 yd3 or 27 ft3

=> Expected Unit Weight = 3690.05 lb / 27 ft3 = 136.67 lb/ft3

Also, Concrete Yield = Weight of all components / Unit weight of concrete

=> Yield = 3690.05 / 136.67 = 27 ft3 or 1 yd3

4 0
4 years ago
PLEASE ANSWER ASAP!
Butoxors [25]

Answer:

Please check the explanation.

Explanation:

While driving, white lines would require us to stay within the lane, also marking the shoulder of the roadway.

While yellow lines generally mark the center of a two-way road being used for two-way traffic.

We generally can pass on a two-way road if the yellow centerline is broken.

7 0
3 years ago
Read 2 more answers
When the 2.8-kg bob is given a horizontal speed of 1.5 m/s, it begins to rotate around the horizontal circular path A. The force
Rama09 [41]

Answer:

The speed is the same at 1.5 m/s while

The work done by the force F is 0.4335 J

Explanation:

Here we have angular acceleration α = v²/r

Force = ma = 2.8 × 1.5²/r₁

and ω₁ = v₁/r₁ = ω₂ = v₁/r₂

The distance moved by the force = 600 - 300 = 300 mm = 0.3 m

If the velocity is constant

The speed is 1.5 m/s while the work done is

2.8 × 1.5²1/(effective radius) ×0.3

r₁ = effective radius

2.8*9.81 = 2.8 × 1.5²/r₁

r₁ = 0.229

The work done by the force = 2.8 × 1.5²*1/r₁ *0.3 = 0.4335 J

4 0
3 years ago
Other questions:
  • The enthalpy of the water entering an actual pump is 500 kJ/kg and the enthalpy of the water leaving it is 550 kJ/kg. The pump h
    10·1 answer
  • 10. What does a profile of a river from its headwaters to its mouth typically show?
    13·1 answer
  • 11.A heat engine operates between two reservoirs at 800 and 20°C. One-half of the work output of the heat engine is used to driv
    6·1 answer
  • A resonant six-turn loop of closely spaced turns is operating at 50 MHz. The radius of the loop is λ/30, and the loop is connect
    15·1 answer
  • What must you do if hauling a load of material which could fall or blow onto the roadway?
    14·1 answer
  • A 6-pole, 50 Hz squirrel cage induction motor has rotor resistance and standstill reactance referred to stator of 0.2 ohm and 1
    7·1 answer
  • List fabrication methods of composite Materials.
    12·1 answer
  • Please help is due tonight
    6·2 answers
  • Estimate (a) the maximum, and (b) the minimum thermal conductivity values (in W/m-K) for a cermet that contains 76 vol% carbide
    9·1 answer
  • While recharging a refrigerant system, the charging stops before the required amount of refrigerant has been inserted. What shou
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!