This work is faster rate than grading 36 assignments in 30 minutes because :
25 ÷ 20 = 1.25
1.25 hw assignment per minute
36 ÷ 30 = 1.2
1.2 hw assignments per minute
Answer:
3.4594
Step-by-step explanation:
To change the base of a logarithm
•
x = 
where c represents the new base
Changing the base from 2 to 10
11 =
≈ 3.4594
Answer:
$11,200
Step-by-step explanation:
Just multiply the percent times the total
8% * 140000 = .08 * 140000 = 11200
Answer:
$80.00
Step-by-step explanation:
We have: 120 ft = 40 yards (divide the length value by 3
)
=> Jerome will cost: 40 x $2.00 = $80.00 for the fencing.
Huh??? what does that mean