<span>
<span>Speed
is calculated as distance covered, divided by the time taken to cover that
distance. In this case, the sales person covered 50KM in 45minutes (which can
also be expressed as 3/4 hours). To calculate the speed he used to cover this
distance, we divide the distance covered by the time taken. So 50km/3/4hours.
This gives us 66.67km/hr. In order to calculate the amount of time the
salesperson used to travel from the office to the sales person, we calculate
as follows 250km/66.67km/hr. This gives us a total of 3.75 hours or 3 hours 45 minutes.</span></span>
"a is 4 more than b" ⇒ a = b +4
"a is 1 lesss than b" ⇒ a = b - 1
The first pair of equations is the appropriate choice.
Answer:
good
those desert people ought to use less water
Job order costing also gives managers the advantage of being able to keep track of individuals' and teams' performance in terms of cost control, efficiency, and productivity. A disadvantage of job order costing is that employees are required to track all materials and labor used during the job.
With the standardization of products, managers track performance, productivity, and costs over time. Process costing allows for greater flexibility when making changes in the production process. Managers can target specific departments' processes or materials to lower production costs.
With process costing, companies track the flow of costs from department to department, rather than tracking costs for each individual item. Each department adds direct labor and manufacturing overhead costs, plus the cost of any raw materials it uses.
Learn more about the costing system at
brainly.com/question/24516871
#SPJ4
If she has 20 dollars and her mom gives her 5 more that would be 25 dollars.
<span>if each gift cost 5 dollars then you would divide 25 by 5 which would come out to 5 gifts. </span>