Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting
Answer:
Are you graphing?
Step-by-step explanation:
Given that 1 pint is equal to 437 ml
and 1000 ml=1 liter
then
1 pint =(437/1000) liters
simplifying we get:
1 pint= 0.437 liters
thus amount of pints in 4 liters will be:
4/0.473
=8.45666586
~8.5 pints
I would say that y=x2+4x+8 simply because it matches what the original equation
Answer:
The first option
Step-by-step explanation:
the sign only flips when there is a negative number.
i hope this is correct