1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
vesna_86 [32]
3 years ago
12

During a sale, a store offered a 40% discount on a tablet that originally sold for $760.

Mathematics
1 answer:
elena-s [515]3 years ago
7 0

Answer:

304

Step-by-step explanation: x/760 40/100=

760x40=30,400

30,400 divided by 100=304

You might be interested in
Find the value of x.<br> A.70<br> B.54<br> C.40<br> D.74
Nuetrik [128]

Answer:

a is the value of X

Step-by-step explanation:

8 0
3 years ago
if 5 kids are reading books in the library and they're are 12 kids and the other kids want to read to but it takes 33 minutes to
mixas84 [53]

Answer:

the answer is 6

Step-by-step explanation:

because 33 minutes to 5pm is 76 min so you divide 76 by 12 so its 6

4 0
3 years ago
Someone please explain (:
GaryK [48]

Answer:

a.) 1.38 seconds

b.) 17.59ft

Step-by-step explanation:

h(t) = -16t^2 + 22.08t + 6

if we were to graph this, the vertex of the function would be the point, which if we substituted into the function would give us the maximum height.

to find the vertex, since we are dealing with something called "quadratic form" ax^2+bx+c, we can use a formula to find the vertex

-b/2a

b=22.08

a=-16

-22.08/-16, we get 1.38 when the minuses cancel out. since our x is time, it will be 1.38 seconds

now since the vertex is 1.38, we can substitute 1.38 into the function to find the maximum height.

h(1.38)= -16(1.38)^2 + 22.08t + 6 -----> is maximum height.

approximately = 17.59ft -------> calculator used, and rounded to 2 significant figures.

for c the time can be equal to (69+sqrt(8511))/100, as the negative version would be incompatible since we are talking about time. or if you wanted a rounded decimal, approx 1.62 seconds.

7 0
3 years ago
Read 2 more answers
Three experts gave opinions on how long a task will take to finish. The estimates were 29, 10, and 12 days (in no particular ord
nirvana33 [79]

Answer:

15

Step-by-step explanation:

PERT estimate is a measuring strategy that is based on a weighted average. It is used in measuring the uncertainty and risk via three estimates to determine an estimated likelihood for a project's cost or period of completion.

The formula is (O + 4M + P) ÷ 6

Where P is the most pessimistic = 29

M is the most likely = 12

O is the most optimistic = 10

Hence we have (10 + [4*12]+ 29) ÷ 6

= (10 + 48 + 29) ÷ 6

= 87÷6 = 14.5 ≈ 15

Rounded figure is equal to 15.

Hence the final answer to the question is 15

7 0
3 years ago
Type the correct answer in each box. Use numerals instead of words. If necessary, use / for the fraction bar(s).
schepotkina [342]
I need you to be more specific
8 0
3 years ago
Read 2 more answers
Other questions:
  • Find the mileage for a car that travels 576 miles on 18 gallons of gas.
    13·2 answers
  • Help? Due today please
    7·1 answer
  • Explain why estimation is an important skill to know when adding and subtracting decimals.
    8·2 answers
  • Can someone please help me
    11·1 answer
  • please help it’s due soon marking brainlest look at my examples determine whether the two expressions are equivalent. if so tell
    8·1 answer
  • HELP ASAP WILL MARK BRAINLIEST
    8·1 answer
  • HELP ME IM GONNA LOSE MY MIND IN MINUTES
    11·2 answers
  • Is there any Indian active right now?​
    6·1 answer
  • Write 25 and 13 as equivalent fractions using a common denominator.
    9·2 answers
  • Pl. z help me I need help..
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!