Answer:
Examples relating to project management are if machine malfunctions, computer crashes, there is a power cut, etc. These kinds of random things that can happen during a project are examples of special cause variation. One way to evaluate a project’s health is to track the difference between the original project plan and what is happening.
Answer:
holaaaaaaa HEHEEH so um do you need help
<span>Had the Himalayas not existed, the culture and history of China and India would be quite different mainly due to the difference in climate that would have occurred. India would not be plagued with monsoon season, which is a large part of the history and development and current culture of India. Without the Himalayas, China would be a much more arid climate, making it much less suitable for a civilization to have thrived in that location.</span>
Answer: Harsh climate conditions that do not favor crop growth i.e a limited availability of rainfall (less than 250mm/year.)
That is when the Senate assasinated his father