Answer:
16 hours
Step-by-step explanation:
let t be time, n the number of computers and w the number of workers, then
t =
← k is the constant of variation
To find k use the condition n = 30, w = 6 and t = 10 , then
10 =
( multiply both sides by 6 )
60 = 30k ( divide both sides by 30 )
2 = k
t =
← equation of variation
When w = 5 and n = 40 , then
t =
=
= 16 hours
Answer:
C) y = 2x + 7; y = 2x + 2
Step-by-step explanation:
The two lines are parallel and so will have the same slope.
From the graph, the slope of both lines are two.
Using slope intercept formula, y=mx+c, with m=2, we have y=2x+c
The blue line has a y-intercept of 2 so the equation is

The red line has a y-intercept of -7 so the equation is

Hence the system is
y=2x+2
y=2x-7
The correct answer is C
Answer:
a) 1/800 or 0.00125
b) i) 0.0013
ii) 0.001
c) 60%
Step-by-step explanation:
T = [tan(2×30)+1][2cos(30)-1] ÷ (y²-x²)
T = (tan60 + 1)(2cos30 - 1) ÷ (41² - 9²)
T = (sqrt(3) + 1)(sqrt(3) - 1) ÷ 1600
T = (3-1)/1600
T = 2/1600
T = 1/800
T = 0.00125
Error: 0.002 - 0.00125
0.00075
%error
0.00075/0.00125 × 100
60%
Answer:
The ranger will need to clear trail for more than 10 2/3 additional hours.
Step-by-step explanation:
49*237
11613
That's a lot of sugar, diabetes here we come :)