Answer:
4 units
Step-by-step explanation:
You have a triangle. This means that the formula is 1/2 x b x h. So its 2 x 4 = 8. Then its 8 x 1/2 which gives you 4.
When you're subtracting negatives, you're adding them so... Here's a tip:
-9 - (-83)
So..
-9 + (-83) = -92
Answer:
765 J
Step-by-step explanation:
We are given;
Mass of bucket = 30 kg
Mass of rope = 0.3 kg/m
height of building= 30 meter
Now,
work done lifting the bucket (sand and rope) to the building = work done in lifting the rope + work done in lifting the sand
Or W = W1 + W2
Work done in lifting the rope is given as,
W1 = Force x displacement
W1 = (30,0)∫(0.2x .dx)
Integrating, we have;
W1 = [0.2x²/2] at boundary of 30 and 0
W1 = 0.1(30²)
W1 = 90 J
work done in lifting the sand is given as;
W2 = (30,0)∫(F .dx)
F = mx + c
Where, c = 30 - 15 = 15
m = (30 - 15)/(30 - 0)
m = 15/30 = 0.5
So,
F = 0.5x + 15
Thus,
W2 = (30,0)∫(0.5x + 15 .dx)
Integrating, we have;
W2 = (0.5x²/2) + 15x at boundary of 30 and 0
So,
W2 = (0.5 × 30²)/2) + 15(30)
W2 = 225 + 450
W2 = 675 J
Therefore,
work done lifting the bucket (sand and rope) to the top of the building,
W = 90 + 675
W = 765 J
The answer for your question is (x,y)=(4,9)
Answer:
<em> boys median:50 mean:46
</em>
<em> girls median:33 mean:34
</em><em> </em>
Step-by-step explanation: because both groups 10 scores the mean is average and median is the middle number.
i think this is the answer if I'm not wrong I tried I hope I helped.