1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Ilya [14]
3 years ago
11

The triangle P(1.-4), U(5,0) and N(2, 1) is reflected over the y-axis. What are the coordinates of the new points?

Mathematics
1 answer:
vichka [17]3 years ago
6 0

Answer:

Step-by-step explanation:

Reflection of x axis

1) the new points have the same  x coordinates

2) the new point have the opposite y coordinates

P (1;4) ; U (5;0) ; N(2;-1)

You might be interested in
If f(x) = 4x-x², find<br> square root f(3/2)
katrin [286]

Answer:

\frac{\sqrt{15} }{2}

Step-by-step explanation:

\sqrt{f(\frac{3}{2} ) , substitute \frac{3}{2} to x

f(\frac{3}{2} )=4(\frac{3}{2} )-(\frac{3}{2} )^2 = \frac{15}{4} or 3.75

\sqrt{f(\frac{3}{2} )=\sqrt{3.75} = \frac{\sqrt{15} }{2}

6 0
2 years ago
measure the length of 10 color pencils to the nearest fourth inch.then make a line plot of the data.?
lesantik [10]
The answer is about 70 inch
4 0
3 years ago
Read 2 more answers
M5_A3. The expected project completion time for the construction of a pressure vessel is 18 monthsand the project variance is 7.
snow_tiger [21]

Answer:

a) 0.3520

b) 0.9884

c) 0.1292

d) 0.1292

e) 0.7648

Step-by-step explanation:

Problems of normally distributed samples can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by

Z = \frac{X - \mu}{\sigma}

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X.

In this problem, we have that:

The expected project completion time for the construction of a pressure vessel is 18 months. So \mu = 18.

And the project variance is 7. The standard deviation is the square root of the variance, so \sigma = \sqrt{7}.

a) What is the probability that the project will require at least 19 months?

The pvalue of the zscore of X = 19 is the probability that the project will require less than 19 months. So the probability that the project will require at least 19 months is the subtraction of 1 by this pvalue.

Z = \frac{X - \mu}{\sigma}

Z = \frac{19 - 18}{\sqrt{7}}

Z = 0.38

The pvalue of Z = 0.38 is 0.6480.

So the probability that the project will require at least 19 months is 1 - 0.6480 = 0.3520.

b) What is the probability that the project will be completed within 24 months?

This is the pvalue of the zscore of X = 24.

Z = \frac{X - \mu}{\sigma}

Z = \frac{24 - 18}{\sqrt{7}}

Z = 2.27

The pvalue of Z = 2.27 is .9884. This means that the probability that the project will be completed within 24 months is .9884.

c) What is the probability that the project will require at least 21 months?

Same logic as a). We find the pvalue of the zscore of X = 21, then we subtract 1 by this value.

Z = \frac{X - \mu}{\sigma}

Z = \frac{21 - 18}{\sqrt{7}}

Z = 1.13

The pvalue of Z = 1.13 is 0.8708.

So the probability that the project will require at least 21 months is 1 - 0.8708 = 0.1292.

d) What is the probability that the project will be completed within 15 months?

Same logic as b). This is the pvalue of the zscore of X = 15.

Z = \frac{X - \mu}{\sigma}

Z = \frac{15 - 18}{\sqrt{7}}

Z = -1.13

The pvalue of Z = -1.13 is .1292. This means that the probability that the project will be completed within 15 months is .1292.

e) What is the probability that the project will take between 16 and 24 months to complete?

This is the pvalue of Z = 24 subtract by the pvalue of Z = 16.

In b), we found that the pvalue of Z = 24 is .9884

Now we find the pvalue of Z = 16

Z = \frac{X - \mu}{\sigma}

Z = \frac{16 - 18}{\sqrt{7}}

Z = -0.76

The pvalue of Z = -0.76 is 0.2236

So the probability that the project will take between 16 and 24 months to complete is 0.9884 - 0.2236 = 0.7648

8 0
4 years ago
Help me!! pls math question
Doss [256]

Answer:

a) 33

Step-by-step explanation:

triangle inequality theorem

- the sum of any two sides of a triangle must be greater than the third

7 0
3 years ago
Read 2 more answers
If sin 0 = -<br> and 270º &lt; 0&lt; 360°, what is cos 0?
Alik [6]

Answer:

  cos(θ) > 0

Step-by-step explanation:

In Quadrant IV, the cosine is positive.

__

In the attached, trig functions not listed are negative.

7 0
3 years ago
Other questions:
  • Clover has some chocolate bars. Kelly has 4 times as many chocolate bars as Clover. Hidy has 6 times as many chocolate bars as C
    8·1 answer
  • PLEASE NEED HELP NOW!!! 50 POINTS AND BRAINLY!!!!!
    11·1 answer
  • If aisha deposits $2250 in a savings account that earns 3.5% annual simple interest, how long must she keep the money in the acc
    10·1 answer
  • Answer #3 and #4 pretty please!!!
    7·2 answers
  • Simon bought a $48 table on sale at 30% off.
    9·1 answer
  • Please help asap 30 pts
    8·1 answer
  • (problem is on the picture included) Solve for x
    12·1 answer
  • 12/4 - 1 3/4 can someone please help?
    8·2 answers
  • Which statement regarding the number of solutions for the linear equation shown below is true?
    8·2 answers
  • Find the product of (x+10) (x-10)
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!