Donaldo's reaction to his manager's assessment is exemplified by the performance measurement criterion known as <u>acceptability</u>.
<h3>What are the criteria of performance measurment?</h3>
The criteria of performance measurement include acceptability, relevance, meaningfulness or applicability, evidence-based, reliability or reproducibility, validity, and feasibility.
Donaldo should have accepted his manager's assessment on his performance evaluation with the timely and complete feedback received from the manager to improve his performance.
Thus, the performance measurement criterion exemplified by Donaldo's reaction is <u>acceptability</u>.
Learn more about performance measurement tests at brainly.com/question/3835272
Answer:
The three sites that are listed as sensitive sites in the location and transportation (LT) category that should be built on are;
1. Wetlands
2. Prime farmland
3. Flood plains
Explanation:
The location and transportation category of credits is based on where the project is located and the accessibility to public transport. Accessibility is looked at in terms of how flexible the area fits in with different modes of public transport. Either by bus, or by train. These credits are awarded based on a number of factors that promotes environmental conservation, accessibility to public transport, and even public parks. The main goal of having this kind of rating systems is in to encourage green building systems. For example, by making public transport easily accessible to the public, the need for personal cars is greatly reduces. This in turn reduces the level of carbon emissions from the cars.
An attempt has also been made to protect building in sensitive locations like;
a. Wetlands: a wetland is distinct area where that is seasonally or permanently flooded with water. Building in such areas should be limited since the water is essential for human survival. Water in such areas also supports various Eco-systems and thus should not be tampered with. Building near wetlands also promotes pollution and thus should be avoided.
b. Prime farmland: this is a designated place by the United States department of agriculture that has the best physical and chemical environmental conditions for agricultural activities. They also need to be protected.
c. Floodplains: this is a low-lying area that forms part of a river basin where the river stretches out across the banks during flooding. Building in such areas should be prohibited since they can cause collapse and loss of lives. Buildings in such areas are also prone to pollution and thus should be avoided.
Answer:
True
Explanation:
Debt certificate is a written agreement of purchasing a bond from a private company or government, it gives information regarding the maturity date, face value and principal amount. They are normally issued to consumers and business, but investors can also buy bonds or debt certificate by buying the right to loans and mortgages, it allows them to buy debt certificates.
The most common reason as to why the contractor may be
indebted to the Government is because of defective pricing. Defective pricing
usually occurs when a contractor fails to submit or to even disclose pricing
data or the government cost in which is even complete or accurate in reaching
the agreed price. This is usually found at post-award audits in which the data
are being analyzed.
Answer and Explanation:
d. is the Fed's primary monetary policymaking body.