No no no no no no no no no jk its c your welcome
Answer: 8 minimum work stations is what would be needed.
Step-by-step explanation:
The cycle time is computed as the operating time daily divided by the scheduled output.
It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.
Therefore,
If you need to produce 30units/hour.
The average cycle time is as follow:
The average cycle time is the average time between the completions of units.
60/30= 2 average cycle time
=16/2
=8
8 work stations is the minimum number that would be needed.
It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.
Answer:
10.5 is the answer
Step-by-step explanation:
4(5y−8−2)=185−15
(4)(5y)+(4)(−8)+(4)(−2)=185+−15(Distribute)
20y+−32+−8=185+−15
(20y)+(−32+−8)=(185+−15)(Combine Like Terms)
20y+−40=170
20y−40=170
20y−40+40=170+40
20y=210
20y/20=210/20
y=21/2
y=10.5
(a) The sum of length and width is half the perimeter, so the breadth in terms of length (x) in cm will be
.. breadth = 34 -x
(b) Then the expression for the area (in cm^2) is
.. area = length*breadth
.. 253 = (x)(34 -x)
.. x^2 -34x +253 = 0 . . . . . subtract the right side, eliminate parentheses
.. (x -11)(x -23) = 0 . . . . . . . factor
.. x = 11 or 23
The dimensions of the rectangle are 11 cm by 23 cm.