Answer:
Step-by-step explanation:
x is the amount of hours it will take. Since he pays $30 per hour, your answer would be 30x + 525
Answer:
46.74ft²
Step-by-step explanation:
A= H(b) b/2 ≈ Sum of your area
<h3>
Answer: 4900 mph</h3>
Work Shown:
30 min = 30/60 = 0.5 hours
distance = rate*time
rate = distance/time
rate = (2450 miles)/(0.5 hours)
rate = (2450/0.5) mph
rate = 4900 mph
For the sake of comparison, a typical commercial passenger jet can reach max speeds of about 600 mph.
Answer: option d. C (0,3), D (0,5).
Justification:
1) The x - coordinates of the vertices A and B are shown in the diagrama, They are both - 4, so the new vertices C and D must be in a line parallel to y = - 4.
2) The y-coordinates of the vertices A and B are also shown in the diagrama. They are equal to 3 and 5 respectively.
3) We can see that the new points C and D must be over a parallel line to y = - 4 and that their distance to the points A and B has to be the same distance of the point R and S to U and T.
That distance is 4, so the line may be y = - 7 or y = 0.
4) If the line is y = 7 the points C and D would have coordinates (-7,3) and (-7,5), but this points are not among the options.
5) If the line is y = 0 the points C and D would have coordinates (0, 3) and (0,5), which is precisely the points of the option d. That is the answer.