I think you would have to multiply $4.92 and 6... if so the answer would be $29.52 for the unit price.
3.25 hours you take 4680÷1440 = 3.25
Step-by-step explanation:
The nth term of a geometric progression can be determined by using the formula:
Tn=arn−1
where: a = first term and r = common ratio
Substitute the given values of first term and common ratio into the formula:
Tn=arn−1
T5=(40)(0.5)5−1
T5=(40)(0.5)4
T5=(40)(0.0625)
T5=2.5
Answer:
(a) Speed = 6.875 m/s
(b) Kinetic Energy = 1.70 kJ
(c) Average power = 1.06 kW
Step-by-step explanation:
Given:
d = 5.5 m
t = 1.6 s
W = 706 N
Part (a)
Using the equation of motion with the assumption of zero initial speed:


The speed of the sprinter then become:

Part (b)
Convert the weight of the sprinter to mass:



KE (Kinetic Energy) can then be calculated as:



Part (c)
The change of the kinetic energy is equivalent to the work done by the sprinter. The average power P is the rate of the work done and can be calculated as



Answer:
Practice, study, get involved in school activities involving math, don’t get too stressed out when it doesn't work, and always try again.