Three tenths times twelve

Mathematics
1 answer:
Sholpan [36]3 years ago
7 0

Answer:

3.6

Step-by-step explanation:

0.3x12=3.6

Because you know that 12x3=36, so 12x0.3=3.6!

Good luck!

You might be interested in
The length of the side of square A is 50% of the length of the square side expressing the area of ​​the shaded area of ​​square
KonstantinChe [14]

Answer:

Let's call the side of square b x. Therefore, the side of square a is 0.5x, making its area 0.25x² and the area of square b is x². This means that the percentage is 25%.

8 0
3 years ago
Given solve triangle ABC. Round the answer to the nearest hundredth. A. A- 9.590, B8841°, c-11.89 B. A 9.590, B-8841, c 12.17 C.
nikitadnepr [17]
I think the answer is b
3 0
4 years ago
Write an equation and solve.<br> How opd am I if 400 reduced by 2 times my age is 244?
seropon [69]

Answer:

78

Step-by-step explanation:

x = your age

400 - 2x = 244

subtract 400 from both sides of the equation:

-2x = -156

divide both sides by -2:

x = 78

4 0
3 years ago
Read 2 more answers
A map has a scale of 3 in. = 16 mi. If you measured the distance between two cities to be 23 in. on the map, how many miles woul
Scrat [10]

Answer:

122.667

Step-by-step explanation:

23/3=7.667

7.667*16=122.667

8 0
3 years ago
What is minimal completion time for the activities in the graph below? In a complete sentence, explain how you got your answer
kupik [55]
The minimal completion time for the activities is the shortest possible time for all the activities to be finished. In doing this, we look at the path that would require the greatest amount of time. At the START node, we choose the path that would take the longest which is 7 days leading to ACTIVITY D. Next, we choose the path leading to ACTIVITY B which takes 5 days. Then, we move to ACTIVITY C taking 5 days and finally, reach the END which would take 6 days. So, the minimal completion time is:
7 + 5 + 5 + 6 = 23 days
6 0
3 years ago
Other questions:
  • Simplify the expression 55-4*5+12
    11·2 answers
  • Evaluate the function at the fiven values of the variables:
    8·1 answer
  • Quadrilateral ACEG ≅ Quadrilateral NMRP
    14·2 answers
  • Are similar polygons congruent?
    10·2 answers
  • Cindy claims that if there is a variable is in the denominator, the equation three over x plus one over three equals five over s
    7·1 answer
  • Margot used
    12·2 answers
  • A pyramid shaped building is 873 ft tall with a square base that is 147 ft on each side. What is the volume of the​ pyramid?
    11·1 answer
  • Samantha’s college runs on a trimester schedule so she receives a bill 3 times a year for tuition. Each trimester costs $1,450,
    11·1 answer
  • ??answer!?? Plsssss: )
    8·1 answer
  • Given the following unit circle, rotate green dot to the appropriate angle and then
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!