9514 1404 393
Answer:
3.5 hr
Step-by-step explanation:
We assume that "the same rate" means effort per tree is a constant. "Effort" is measured as the product of lumberjacks and hours. Then ...
(lumberjacks)(hours)/trees = (6)(2)/15 = (8)(t)/35
Multiplying by 35/8, we have ...
(35/8)(12/15) = t = (3·4·5·7)/(2·3·4·5) = 7/2 = 3.5
It will take 8 lumberjacks 3.5 hours to cut down 35 trees.
Answer:
103 chairs
Step-by-step explanation:
cost = fee + cost per chair * number of chairs
410 = 100 + 3*c
Subtract 100 from each side
410-100 = 100+3c-100
310 = 3c
Divide by 3
310/3 = 3c/3
103.3=c
We cannot rent part of a chair so we round down
103 chairs
Answer:
2.25
Step-by-step explanation:
The total frequency is:
20 + 12 + 6 + 2 = 40
Calculate the probability of each score:
P(X=3) = 20/40 = 0.50
P(X=2) = 12/40 = 0.30
P(X=1) = 6/40 = 0.15
P(X=0) = 2/40 = 0.05
So the expected value is:
E = (3)(0.50) + (2)(0.30) + (1)(0.15) + (0)(0.05)
E = 2.25
Step-by-step explanation:
f(-5)=-10+15=5
g(5)=25-1=24
A. It's is zero or the center of the grid.
B. Go to the first number on the x axis then for the second number go up the t axis.