1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
timofeeve [1]
3 years ago
8

What is the value of X in the equation x²-6x+9=25

Mathematics
1 answer:
zimovet [89]3 years ago
3 0

Answer:

X = -2 or X = 8

Explanation:

You might be interested in
To make 5 apple pies you need about 2 pounds of apples . how many pounds of apples do you need to mack 20 apple pies.
rodikova [14]
40 pounds, because 20 times 2 is 40.
4 0
3 years ago
Read 2 more answers
Solve the system of linear equations by graphing.
Katyanochek1 [597]
The answer is a) x=-4.5, y=-4.25
6 0
3 years ago
soda pop is on sale at a price $10 for 3 packs. What is the scale factor that can be used to find out how much it would cost to
forsale [732]

Answer:

My answer is:

Step-by-step explanation:

150$ for 15

8 0
3 years ago
Plot a graph for the following data recorded for an object falling from rest
shusha [124]
  1. The kind of curve obtained is linear.
  2. The relationship between the variables is direct variation.
  3. After 4.5 seconds, I expect the velocity to be equal to 140 ft/s.
  4. The amount of time required for the object to attain a speed of 100 ft/s is 3.2 seconds.

<h3>What is a graph?</h3>

A graph can be defined as a type of chart that's commonly used to graphically represent data on both the horizontal and vertical lines of a Cartesian coordinate, which are the x-axis and y-axis.

In this exercise, you're required to plot a graph for the data (velocity and time) recorded for an object that is falling from rest.

Based on the graph for the data (see attachment), we can logically deduce the following points:

  • The kind of curve obtained is linear.
  • The relationship between the variables is direct variation.
  • After 4.5 seconds, I expect the velocity to be equal to 140 ft/s.
  • The amount of time required for the object to attain a speed of 100 ft/s is 3.2 seconds.

Read more on graphs here: brainly.com/question/25875680

#SPJ1

Complete Question:

Plot a graph for the following data recorded for an object falling from rest

a. What kind of a curve did you obtain?

b. What is the relationship between the variables?

c. What do you expect the velocity to be after 4.5 s?

d. How much time is required for the object to attain a speed of 100 ft/s?

7 0
2 years ago
BRAINLIEST <br> Solve for X. Round to the nearest tenth.
Dvinal [7]

Answer:

1) 44.83 feet 2) 2352.3

Step-by-step explanation:

7 0
2 years ago
Read 2 more answers
Other questions:
  • The costa Family hiked a trial that was two miles in one direction How many feet was the hike round trip?
    6·1 answer
  • in the xy-plane above, point c has coordinates (6,9) which of the following is an equation of the line that contains points o an
    15·1 answer
  • Which of the following statements is true?
    14·1 answer
  • (Will give brainliest to first correct answer) Multiply.
    15·2 answers
  • The triangles shown are similar. Which is an appropriate similarity statement for the triangles?
    8·1 answer
  • What is the domain and range for the function graphed below
    6·1 answer
  • Select all the statements that must be true, ​
    13·1 answer
  • Jack's Plumbing charges customers $100 per hour for repair jobs. A-1 Plumbing charges according to
    13·1 answer
  • Sergei says that 10% of a number will always be less than 20% of any other number.
    6·1 answer
  • WAaAa im very confused, help
    7·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!