Answer:
which line!
x or y axis?
first image is over the x axis
second is over the y
Step-by-step explanation:
HOPE THIS HELPS, BRAINLIEAST PLZZ
Answer:
3 complete shifts of 3/4 hour and 1 one-third of the 3/4 hour shift.
Step-by-step explanation:
Total work hours = 2.5 hours
Each shift = 0.75 hr
Number of shifts = Total work hours / Each shift
= 2.5 / 0.75
= 3.33
He worked for 3 complete shifts of 3/4 hour and
1 one-third of the 3/4 hour shift.
Answer:
2/6<2/4
Step-by-step explanation:
We can start by simplifying the two fractions. 2/6=1/3 and 2/4=1/2. 1/3<1/2 so 2/6 is smaller than 2/4.
If a triangle equals 180, than what you want to do is add all of the numbers together. 33+21+28= 82.
After that what you want to do is subtract that by the total of the triangle "180"
180-82=98.
I believe 98 is the answer