Answer:
D is the right answer
Step-by-step explanation:
Answer:

Step-by-step explanation:
Give data:






for 95% confidence interval

from standard z- table
confidence interval for P_1 and P_2 is



confidence interval is


Answer:
The height of the building is 
Step-by-step explanation:
see the attached figure to better understand the problem
we know that
In the right triangle ABC

we have

substitute and solve for BC


Find the height of the building
The height of the building (h) is equal to

Your answer is 4 1/2 your welcome
Answer:
A)85
Step-by-step explanation:
Calculation for the resulting tracking signal
Using this formula
Tracking signal= Last forecast error statistics (RSFE) /Low MAD (Mean Absolute Deviation)
Let plug in the formula
Tracking signal=34/0.4
Tracking signal=85
Therefore the resulting tracking signal will be 85