PLEASE HELPPPP?!?!?!?!​

Mathematics
1 answer:
Airida [17]3 years ago
8 0
Ab/ goes at the bottoms
You might be interested in
Can someone check if I’m right on this! Kinda in a rush
antiseptic1488 [7]

Answer:

Yes, you are correct

Step-by-step explanation:

4 0
4 years ago
Value of x is in solution set of 8x-6>12+2x
quester [9]

Answer:

x>3

Step-by-step explanation:

8x-6>12+2x

Subtract 2x from each side

8x-2x-6>12+2x-2x

6x -6 > 12

Add 6 to each side

6x-6 +6 > 12+6

6x> 18

Divide each side by 6

6x/6 >18/6

x>3

8 0
4 years ago
I am an odd number, I am less than 100, the sum of my digits is 12, I am a multiple of 15. What number am I
vova2212 [387]
The answer is 3 
Think of two odd numbers (1,3,5,7,or 9) that add up to twelve.
 The number as one has to be a multiple of 15 (15 should be able to be multiplied by any number to get to that odd number).
3 0
3 years ago
Read 2 more answers
Find the slope of the line passing through each of the following pairs of points: A(−7, a) and B(c, d)
Mrrafil [7]

The formula of a slope:

m=\dfrac{y_2-y_1}{x_2-x_1}

We have the points A(-7, a) and B(c, d).

Substitute:

m=\dfrac{d-a}{c-(-7)}=\dfrac{d-a}{c+7}

Exception: c ≠ -7.

3 0
4 years ago
M5_A3. The expected project completion time for the construction of a pressure vessel is 18 monthsand the project variance is 7.
snow_tiger [21]

Answer:

a) 0.3520

b) 0.9884

c) 0.1292

d) 0.1292

e) 0.7648

Step-by-step explanation:

Problems of normally distributed samples can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by

Z = \frac{X - \mu}{\sigma}

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X.

In this problem, we have that:

The expected project completion time for the construction of a pressure vessel is 18 months. So \mu = 18.

And the project variance is 7. The standard deviation is the square root of the variance, so \sigma = \sqrt{7}.

a) What is the probability that the project will require at least 19 months?

The pvalue of the zscore of X = 19 is the probability that the project will require less than 19 months. So the probability that the project will require at least 19 months is the subtraction of 1 by this pvalue.

Z = \frac{X - \mu}{\sigma}

Z = \frac{19 - 18}{\sqrt{7}}

Z = 0.38

The pvalue of Z = 0.38 is 0.6480.

So the probability that the project will require at least 19 months is 1 - 0.6480 = 0.3520.

b) What is the probability that the project will be completed within 24 months?

This is the pvalue of the zscore of X = 24.

Z = \frac{X - \mu}{\sigma}

Z = \frac{24 - 18}{\sqrt{7}}

Z = 2.27

The pvalue of Z = 2.27 is .9884. This means that the probability that the project will be completed within 24 months is .9884.

c) What is the probability that the project will require at least 21 months?

Same logic as a). We find the pvalue of the zscore of X = 21, then we subtract 1 by this value.

Z = \frac{X - \mu}{\sigma}

Z = \frac{21 - 18}{\sqrt{7}}

Z = 1.13

The pvalue of Z = 1.13 is 0.8708.

So the probability that the project will require at least 21 months is 1 - 0.8708 = 0.1292.

d) What is the probability that the project will be completed within 15 months?

Same logic as b). This is the pvalue of the zscore of X = 15.

Z = \frac{X - \mu}{\sigma}

Z = \frac{15 - 18}{\sqrt{7}}

Z = -1.13

The pvalue of Z = -1.13 is .1292. This means that the probability that the project will be completed within 15 months is .1292.

e) What is the probability that the project will take between 16 and 24 months to complete?

This is the pvalue of Z = 24 subtract by the pvalue of Z = 16.

In b), we found that the pvalue of Z = 24 is .9884

Now we find the pvalue of Z = 16

Z = \frac{X - \mu}{\sigma}

Z = \frac{16 - 18}{\sqrt{7}}

Z = -0.76

The pvalue of Z = -0.76 is 0.2236

So the probability that the project will take between 16 and 24 months to complete is 0.9884 - 0.2236 = 0.7648

8 0
4 years ago
Other questions:
  • What's the distributive property for 16+48
    12·2 answers
  • watermelon cost $5.69 pinnacle cost 4.98 mango cost 1.09 I have 30.00 to spend what combination of watermelon pineapples and man
    5·2 answers
  • I need help with this. please answer
    12·1 answer
  • Solve<br> F = C + 32 for C
    14·1 answer
  • The width of a rectangle is 12 cm less than the length the perimeter is 156 find the width and length
    15·1 answer
  • Need help really please​
    8·2 answers
  • For the following system, tell which equation you would first use to solve for a variable in the first step of the substitution
    12·1 answer
  • Tell whether the ratios form a proportion 1/5, 6/30
    14·2 answers
  • If Alan read 204 pages in6 hours, how many pages would you expect him<br> to read in 11 hours?
    14·1 answer
  • What is the value of 48 - 32 ÷ 4 · 2
    9·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!