Answer:
x: work a woman can do in 1 day
y: work a girl can do in 1 day
Then
2x + 7y =1/4
4x + 4y =1/3
4x + 14y =2/4 (1)
4x + 4y =1/3 (2)
=> Let (1) - (2), 10y =2/4-1/3 <=>10y = 1/6 <=> y = 1/(6x10) = 1/60 (work)
=> From (2),4x = 1/3 - 4x1/60 => 4x = 16/60 => x = 4/60 (work)
=> 1 day, a woman and a girl can do: 1/60+4/60 = 5/60 =1/12 (work)
Then, the day required for a woman and a girl to complete work: 12 days
Answer:
2.1578
Step-by-step explanation:
Answer:
29
Step-by-step explanation:
The scale factor is six and the dilation is an enlargement.
The two-way table is attached.
We know that 63 people took the survey, and 22 of them were left-handed. This means that 63-22=41 of them are right handed.
Out of the 63 total, 37 are left brain dominant; this means that 63-37=26 are right brain dominant.
Of the 26 that are right brain dominant, 21 are right handed; this means 26-21=5 are left handed.
Of the 22 left-handed people, 5 are right brain dominant; this means 22-5 = 17 are left brain dominant.
Of the 37 left brain dominant people, 17 are left handed; this means 37-17=20 are right handed.