Answer:
5 bags of cement are required.
Step-by-step explanation:
Since to make concrete, the ratio of cement to sand is 1: 3, if cement and sand are sold in bags of equal mass, to determine how many bags of cement are required to make concrete using 15 bags of sand the following calculation must be done:
Cement = 1
Sand = 3
3 = 15
1 = X
15/3 = X
5 = X
Therefore, 5 bags of cement are required.
68.5. You take 62 and divide it by the percentage as a decimal, .905. 62 / .905 = 68.5.
Answer:
b= -0.1
Step-by-step explanation:
Find the slope of the line passing throught the points (2, 2) and (4, 3).
The formula of a slope:

Substitute:

If the point (x, -1) lie on the same line, then the slope of line passing through the points (2, 2) and (x, -1) the same:
Substitute:

We have the equation:
<em>cross multiply</em>

<em>add 2 to both sides</em>

<h3>Answer: x = -4.</h3>
Answer:
Step-by-step explanation:
y - 4 = -5(x + 1)
y - 4 = -5x - 5
y = -5x - 1