1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
natima [27]
3 years ago
9

Find the hyperbolic function of Cothxexponential form​

Mathematics
1 answer:
SpyIntel [72]3 years ago
3 0

Answer:

yoyoyoyoyoyo

Step-by-step explanation:

You might be interested in
A quantity with an initial value of 600 decays exponentially at a rate of
Snowcat [4.5K]

Answer:

The value of the quantity after 87 months will be of 599.64.

Step-by-step explanation:

A quantity with an initial value of 600 decays exponentially at a rate of 0.05% every 6 years.

This means that the quantity, after t periods of 6 years, is given by:

Q(t) = 600(1 - 0.0005)^{t}

What is the value of the quantity after 87 months, to the nearest hundredth?

6 years = 6*12 = 72 months

So 87 months is 87/72 = 1.2083 periods of 6 years. So we have to find Q(1.2083).

Q(t) = 600(1 - 0.0005)^{t}

Q(1.2083) = 600(1 - 0.0005)^{1.2083} = 599.64

The value of the quantity after 87 months will be of 599.64.

8 0
3 years ago
Is each number correctly expressed in scientific notation? Choose Yes or No.
solong [7]

Answer:

  1. No
  2. Yes
  3. Yes

Step-by-step explanation:

The first one is incorrect because would be 4,836,000 instead of 4,836,000,000. The correct notion would be 4.836*10^9

6 0
3 years ago
Find the width of a rectangular prism if the volume is 77,680 cm^3, the length is 43 cm, and the height is 94.4 cm.
Lapatulllka [165]
Set the formula. length x width x height = Volume and solve for whichever
6 0
3 years ago
a certain job can be done in 20 hours by 4 people. how many people are needed to do the same job in 10 hours?
maxonik [38]
If it takes 4 people to get a job done in 20 hours, then in 10 hours, it will take 2 people to complete the same job.
To find out how many people are needed to do this job in 10 hours, we can see that we got to 10 hours by dividing 20 by two so, to see how many people are needed to complete this same job in ten hours, we would just divide 4 people by 2 which is 2 people.
So, in conclusion, if it takes a certain job to be done in 20 hours by 4 people, then it would take 10 hours for that same job to be completed by 2 people.
Glad I could help!
7 0
2 years ago
Please help need this for today
Cloud [144]
All will apply except for (A, C, and E) because those lengths are less than 4/6. So (B, D and F) are the correct answers.
6 0
3 years ago
Other questions:
  • 25,000(4+3x) =125,000
    14·1 answer
  • The area of a rectangle is 1,357 square feet. The length is 59 feet. What is the width?
    7·2 answers
  • A bag of marbles contains 7red 12orange 3blue and 6multicolored what is the probability of randomly selecting a marble that is n
    11·1 answer
  • The average amount of rain per year in Greenville is 49 inches. The standard deviation is 8 inches. Find the probability that ne
    6·1 answer
  • What Type of Measure do we use for length
    13·1 answer
  • If Christy had 81 slime buckets for her shop and her mom gave her 95 times more slime buckets.How many slime buckets does Christ
    11·2 answers
  • Annalisa, Keiko, and Stefan want to compare their heights. Annalisa is 64 inches tall. Stefan tells her, "I'm about 7.5 centimet
    15·2 answers
  • Which integer represents 19°F bellow
    15·1 answer
  • What common base can be used to rewrite each side of the equation<br> 2<br> 3<br> 5<br> 8
    5·2 answers
  • 11<br> El prisma tiene 9 caras, 9 aristas y 6 vertices.<br> (2 puntos)<br> Cierto<br> Falso<br> 1
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!