1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
tino4ka555 [31]
3 years ago
13

Select all the steps needed to create a maintenance schedule. Identify individuals to perform the maintenance. Document or log m

aintenance that has been performed. Take an inventory of the equipment. Obtain test equipment if necessary. Define maintenance tasks. Review the manufacturers' manuals. Establish frequency of tasks. Run the defragmentation utility. Develop a reminder system.
Computers and Technology
1 answer:
Sati [7]3 years ago
6 0

Answer:

Maintenance planning and scheduling, arguably the most neglected functions of modern asset management, are at the heart of an effective maintenance management system. Through the use of work orders and a CMMS, maintenance planning covers the daily or weekly planning, scheduling and control activities to ensure that scheduled work is undertaken, and that available resources are being used optimally. Yet many organizations still struggle to make their maintenance planning and scheduling as effective as it should be.

Maintenance planning

Without planning and scheduling, the wrench-on time for a company is on average only 35%. That means that for every technician working an 8-hour day, only 2.8 hours of that day is spent working on assets. Implementing proper maintenance planning and scheduling, however, can increase the wrench time from 35% to 65%. At this level of efficiency, a technician working an 8-hour day will complete 5.2 hours of actual work. With 65% of the engineer’s time being used efficiently, only 35% of their time is wasted. This improvement would enable an organization to move away from a reactive (firefighting) state of maintenance, and improve overall workforce efficiency.

Explanation:

1. Identify the problem

The need for maintenance can be triggered by a failure, a noisy bearing or an oil leak. Once identified, the problem must be reported to the maintenance department. This is normally done through a work request so that planning and scheduling can take place.

2. Plan the maintenance task

‘Planning’ involves deciding on what exactly needs to be done, determining priority, and defining the sequence of activities and skills required. Ensure that all the resources, material, labor, contract services, specialist equipment, tools and information are available. There may even be a need for outside contractors, items to be purchased or work permits to be obtained, all of which must be arranged in advance.

A maintenance planning function is a critical tool for reducing downtime and maximising the value of preventive maintenance. The maintenance planner must therefore have the technical skills and equipment knowledge to do this planning.

3. Schedule the work

‘Scheduling’ involves deciding when to do the work. This will depend on the priority level of the task, and the availability of both the resources and the equipment to be repaired. Many organizations schedule maintenance for a specific period during the working week or month. Weekend maintenance is never desirable because, in many cases, suppliers are not available and personnel are expensive.

The legal requirements with regard to statutory inspections are generally quite rigid, so try and devise a 52-week maintenance plan at the beginning of each year. Review this plan periodically to improve the accuracy and quality of the information. Communicate the preventive and corrective maintenance requirements to production so that they fully understand the need for the maintenance window.

4. Allocate the task to specific people

Although this will depend on organizational arrangements, consider the following:

Allocate your maintenance personnel to specific areas or pieces of equipment

Ensure the allocated person has the skills to perform the task

Be very clear about the type of work that will be allocated to outside contractors

Where necessary, undertake hazard analyses to identify risks and formulate action plans to control access to high-risk areas; your plans should include hot work permits, confined space permits and lockout procedures.

5. Ensure the work is executed properly

It is usually the responsibility of the maintenance supervisor to confirm that the maintenance work meets the required quality standards, usually through selected planned job observations. The planner (or, in some instances, a maintenance scheduler) should monitor outstanding schedules or work requests to ensure that the planned work was actually done.

6. Analyze the problem and decide how to prevent it from happening again

Analyze the root cause of major failures and take corrective action to prevent recurrence. Corrective action could include training, a change to the preventive maintenance programme or equipment redesign. Breakdown or failure of the management process is often overlooked in a major failure. In those cases, corrective action may be a systems upgrade.

When all six of these foundational steps are implemented and combined correctly, maintenance planning can attain much greater levels of efficiency. This leads to important asset-related data and information being shared across the plant, and even across multiple plants. It’s not an overnight process though, so don’t give up if you think it might take too long. The benefits are well worth it.

Identify and eliminate problems quickly and effectively with How-to Guide: How to use a problem-solving A3 Report, an essential guide to compiling an A3 report

You might be interested in
A given application written in Java runs 15 seconds on a desktop processor. A new Java compiler is released that requires only 0
barxatty [35]

Answer:

9.9 seconds instead of 15 seconds

5.1 seconds faster

Explanation:

See attached picture.

6 0
3 years ago
How does a Computer chip work?
Arlecino [84]
A computer chip is a data space stored on your computer. It is there to to keep all of your computer information in it therefor. A computer chip works with your computer to help it work.
4 0
3 years ago
Read 2 more answers
How to get someone off your best friends list without blocking them
Paraphin [41]

Answer:

Which website

Explanation:

6 0
3 years ago
So this is what i use to code and all of that
givi [52]

Answer: yeah!

Explanation:

Have a good day!

5 0
3 years ago
What is the maximum duration of daily scrum meetings A:15minsB:45minsC10mins:30mins
scoray [572]

Answer:

A

Explanation:

A common approach to a daily scrum (although not the only approach) is for each member of the development team to address the following three daily scrum questions:

1. What did I accomplish since the last daily scrum?

2. What do I plan to work on by the next daily scrum?

3. What are the obstacles or impediments that are preventing me from making progress?

Development teams are typically between five to nine people. Each development team member should need no more than 90 seconds to address the three questions listed above. So, if you had a team of nine people, each of whom took 90 seconds to cover the questions, combined with some overhead of getting the meeting started and transitioning from person to person, you would end up with a meeting duration of about 15 minutes.

To emphasize that 15 minutes should be thought of as a timeboxed limit.

8 0
3 years ago
Read 2 more answers
Other questions:
  • Combination keys perform a function when held down in combination with another key. true or false
    9·1 answer
  • Discuss OPENGL instruction to draw the following drawing primatives:
    14·1 answer
  • Which statements are true about modern
    9·1 answer
  •  How does critically analyzing technology add value to interactions with people in personal and professional contexts?
    7·2 answers
  • How much memory will be occupied by black and white image​
    8·2 answers
  • The _________ lets you move the view of a web page up or down and left or right.
    13·2 answers
  • What is the main difference between a peripheral device and other types of devices? Choose the best answer.
    12·1 answer
  • What are the 3 rules of music<br><br> ps: there is no music subject so i had to put something else
    15·2 answers
  • What is a monitor?<br>i can ask everyone ​
    15·1 answer
  • HELP ME PASS!
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!