1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
RSB [31]
3 years ago
14

Suppose we want to select between two prediction models M1 and M2. We have performed 10-fold cross validation on each. The error

rates obtained for M1 are 30.5, 32.2, 20.7, 20.6,31.0, 41.0, 27.7, 26.0, 21.5, 26.0. The error rates for M1 are 22.4, 14.5, 22.4, 19.6,20.7, 20.4, 22.1, 19.4, 16.2, 35.0.
Is one model significantly better than the other considering a significance level of 1%.?
Computers and Technology
1 answer:
Ksivusya [100]3 years ago
6 0

Answer:

Since the calculated t value does not fall in the critical region we accept H0 and  conclude that  one model is not significantly better than the other at 1% level of significance.

Explanation:

When the observations from two samples are paired either naturally or by design , we find the difference between two observations of each pair. Treating the differences as a random sample from a normal population with mean μd =μ1-μ2 and unknown standard deviation σd we perform one sample t- test on them. This is called paired difference t- test.

M1               M2           Difference            d²

                                  d= (M1-M2)

30.5,         22.4,         8.1                       65.61          

32.2,       14.5,           17.7                      313.29

20.7,       22.4,          -1.7                       8.3521

20.6,       19.6,             1.0                        1

31.0,       20.7,             10.3                     106.09

41.0,      20.4,             20.6                    424.36

27.7,      22.1,              5.6                      31.36

26.0,      19.4,            6.6                         43.56

21.5,       16.2,            5.3                         28.09                    

<u>26.0.       35.0.            -9.0                      81.0          </u>

<u>∑ 329.2     213.1           64.5                    1102.7121</u>

<u />

<u>Now </u>

d` = ∑di/n = 64.5/10= 6.45

sd² = ∑(di-d`)²/n-1= 1/n-1 [ ∑di²- (∑di)²/n]

     =1/9[ 1102.7121 - (64.5)²/10 ]

       =[1102.7121 - 416.025/9]

       = 79.298

sd= 8.734

We state our null and alternate hypotheses as

H0 : μd= 0   and Ha: μd≠0

The significance level is set at ∝ = 0.01

The test statistic under H0  is

t= d`/ sd/√n

which has a t distribution with n-1 degrees of freedom.

The critical region is  t ≥ t (0.005,9)= 3.250

Calculating t

t= 6.45 / 8.734/ √10

t = 6.45 / 8.734/3.162

t= 6.45 / 2.7621

t= 2.335

Since the calculated t value does not fall in the critical region we accept H0 and  conclude that  one model is not significantly better than the other at 1% level of significance.

You might be interested in
Which of the following characteristics of an e-mail header should cause suspicion?A. Multiple recipientsB. No subject lineC. Unk
julsineya [31]

Answer:

The correct answer for the given question is option(b) i.e " No subject line"

Explanation:

In the e-mail subject is the important part which describe the information which kind of particular mail is send or received .if we do not give any subject line in the e-mail header then most of the chances that email will not read by recipients due to this suspicion will be caused.

Unknown Sender and Multiple recipients do not cause suspicion so the correct answer is option(b) i.e No subject line".

3 0
3 years ago
Who am I
kvv77 [185]
1. Patent law or copyright
2. Malware
3. Cybercrime
4. Firewall
4 0
3 years ago
One of the functions of an IDE is to check for: flowchart errors. Syntax errors. memory errors X input and output.​
scoundrel [369]

Answer:

flowchart errors

Explanation:

5 0
3 years ago
Read 2 more answers
What is the correct order of the phases of the software development process?
Damm [24]
Known as the 'software development life cycle,' these six steps include planning, analysis, design, development & implementation, testing & deployment and maintenance. Let's study each of these steps to know how the perfect software is developed.
8 0
3 years ago
Write 'T' for true and 'F' for false statements.
asambeis [7]
1-F
2-T
3-F
4-F
5-F
6 T
7-T
3 0
3 years ago
Other questions:
  • What are the two main advantages to a well-designed relational database over other types?
    10·1 answer
  • What factor(s) should be considered when determining whether a business is too far based on the query and the user location? Sel
    14·1 answer
  • Percy is a lighting technician in a film production. For a shot, the chief lighting technician instructs Percy to get the kind o
    15·1 answer
  • . Why did the designers of the Synchronous Digital Hierarchy choose unusual values for data rates instead of the exact powers of
    11·1 answer
  • The degree to which a firewall can impose user access restrictions is known as which of the following?Security assurancePrivileg
    8·1 answer
  • Microsoft PowerPoint is popular software that allows you tocreate slides, handouts, notes, and outlines.
    12·1 answer
  • A college has 2.3 ratio of men to women in its student body you what is the ratio of women to men
    15·1 answer
  • Term of The surroundings and conditions of your workplace
    6·1 answer
  • The cameras picture review function allows you to look at the _ you've taken
    8·1 answer
  • ¿Cuántos motores tiene el Toyota Prius y que características poseen?
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!