Answer:
The competing company is better
7 for 25.90 vs. 7 for 25.83
Step-by-step explanation:
Since it's 3 for 11.07
we need to see how much higher the price will get at 7, so divde 11.07 by 3 then double the price.
3.69 per box for competing company
11.07*2 = 22.14
22.14 + 3.69= 25.83
Answer:
5.025m
Step-by-step explanation:
The clothesline also creates an upside-down triangle with two sides being 5m, 0.5m, and the hypotenuse being the clothesline.
We can use the pythagorean theorem to find the length of the clothesline.
5 squared +.5 squared= the length of the clothesline squared
25+.25= the square root of 25.25
= 5.025
4/6 is the answers
Hope you get the answer right
Answer: C. 254
Step-by-step explanation: All engineers is the population so this is stats and the number that chose math no matter what kind of engineer is 254
X can be anything you want as long as it is not 1 or -7. If you have repeated x values with different y values, then it won't be a function.