Steps:
1. Substitute the y in y=4x + 4 and put
X-6=-4x+4
2. Add 4x to both sides
3. 5x-6=4
4. Add 6 to both sides
5. 5x=10
6. Divide by 5 on both sides
7. X=2
8. Now to find the y, you substitute 2 for x in the problem y=x-6
9. Y=2-6
10. Y=-4
11. Your answer is
(2, -4)
The red triangle and the green rectangle are 14
The purple triangle and blue square are 16
Triangle is
(1/2)*Base*Height
(3,51)(5,59)
slope = (59 - 51) / (5 - 3) = 8/2 = 4
y = mx + b
slope(m) = 4
(3,51)...x = 3 and y = 51
sub and find b, the y int
51 = 4(3) + b
51 = 12 + b
51 - 12 = b
39 = b
so ur equation is : y = 4x + 39...but u need it in standard form
y = 4x + 39
-4x + y = 39
4x - y = -39 <==== this is ur equation...x = number of hrs and y = total velocity
====================
ur x axis is the number of hrs
ur y axis is total velocity in km
y = 4x + 39......slope = 4.....y int = (0,39)....x int is (- 9.75,0) or -9 3/4 for graphing purposes)....so start at (-9.75,0)...and since the slope is 4, go up 4 and to the right 1....plot that...then up 4 and to the right 1...plot that...u will cross the y axis at (0,39)....and just connect ur plotted points and u have ur line......or what u can do since it is asking for the first 6 hrs....sub in 1 for x and solve for y....then sub in 2 for x and solve for y...keep doing this up till 6 and u will have ur line up till 6 hrs
Answer:
around 6.6 years
Step-by-step explanation:
41,500=14,000*.45*x
41,500=6,300*x
41,000/6,300=x
6.5873=x
6.6=x
hope this helps!