9514 1404 393
Answer:
x = (√6)/10^0.7 ≈ 0.488737
Step-by-step explanation:
It can work reasonably well to take antilogs first.

1 kilometer = 1000 meters so 12 kilometers = 12000 meters
10 laps (400 meters/lap) = 4000 meters
12000/4000 = 3
Answer: 3 days
Answer:
Step-by-step explanation:
If two variables, x and y have a direct variation, it means that an increase in x would lead to a corresponding increase in y. A decrease on x would lead to a corresponding decrease in y.
Therefore, we would compare the scenarios to determine which is not a direct variation. The correct option is
d) Time taken will be less if number of workers are increased to complete the same work.
The rest are direct variation scenarios
Change 1 hour 15 minutes = 1.25 hour because 15 ÷ 60 = 0.25 so we add 0.25 hour and change 2 3/4 to 2.75
Equation:
Multiply 2.75 × 1 = 2.75 ÷ 1.25 =
2.2 miles
I'm pretty sure this is correct
Answer:
7,000
Step-by-step explanation:
The number of actual steps is x.
x + x(.05) = 7350 This is actual steps plus the extra 5% equals the number shown on the tracker.
Pull out x
x (1+.05) = 7350
x (1.05) = 7350 Divide by 1.05
(x (1.05))/1.05 = 7350/1.05
x = 7,000