Answer:
d. 15
Step-by-step explanation:
Putting the values in the shift 2 function
X1 + X2 ≥ 15
where x1= 13, and x2=2
13+12≥ 15
15≥ 15
At least 15 workers must be assigned to the shift 2.
The LP model questions require that the constraints are satisfied.
The constraint for the shift 2 is that the number of workers must be equal or greater than 15
This can be solved using other constraint functions e.g
Putting X4= 0 in
X1 + X4 ≥ 12
gives
X1 ≥ 12
Now Putting the value X1 ≥ 12 in shift 2 constraint
X1 + X2 ≥ 15
12+ 2≥ 15
14 ≥ 15
this does not satisfy the condition so this is wrong.
Now from
X2 + X3 ≥ 16
Putting X3= 14
X2 + 14 ≥ 16
gives
X2 ≥ 2
Putting these in the shift 2
X1 + X2 ≥ 15
13+2 ≥ 15
15 ≥ 15
Which gives the same result as above.
There are 12 inches in one foot. 120 x 12 = 1,440 inches. The correct ratio to be placed is the 5th one (aka 12 inches over 1 foot).
Millimeter centimeter meter kilometer
Answer:
0.7361
Step-by-step explanation:
In this question we have
number to be 10
Then we have a probability of 10% = 0.10
We have q = 1-p
= 1-0.10 = 0.90
Then the probability of not more than 1 being defective:
P(x=0) + p(x= 1)
(10C0 x 0.1⁰ x 0.9^10-0)+(10C1 x 0.1¹ x 0.9^10-1)
= 1 x1 x0.3487 + 10 x 0.1 x 0.3874
= 0.3487 + 0.3874
= 0.7361
This is the the required probability and this answers the question.
probability = 10 percent = 0.1
q= 1- 10percent = 90% = 0.9
n = 4
To get the required probabiltiy for this question is
P(not greater than one is defective )=P(x=0)+P(x=1)
= 4C0x(0.1)⁰x(0.9)⁴+4C1x(0.1)¹x(0.9)³
= 0.9477
The required probability is 0.9477