1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
GREYUIT [131]
3 years ago
7

PLZ ANSWER !! DUE ASAP PLS

Mathematics
1 answer:
raketka [301]3 years ago
8 0

Answer: - 8/5

Step-by-step explanation:

M1*M2=-1

Substuting M1 as 5/8

We get

5/8*M2=-1

M2=-8/5

You might be interested in
Give the types of quantities
Sergeeva-Olga [200]
Magnitude (how much) and multitude (how many), the two principal types of quantities, are further divided as mathematical and physical.
7 0
3 years ago
The gardener wanted to find the best water to use for growing his plants. If plants need a more neutral pH water for optimal gro
faltersainse [42]

Answer:

Answer:B

Step-by-step explanation:

3 0
3 years ago
Plz help I need help plz
Nutka1998 [239]

Answer:

associative! property! of! addition!

Step-by-step explanation:

we change the order of the addends but the sum doesn't change

8 0
3 years ago
Read 2 more answers
What is 5x-(3+7)=9+2(x-8)
raketka [301]
5x-3-7=9+2x-16
5x-10=2x-7
5x-2x=-7+10
3x=3
X=1
3 0
3 years ago
Read 2 more answers
I WILL MARK BRAINLIEST A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to buil
Alona [7]

Using a system of equations, it is found that since 20 child bikes and 6 adult bikes would require more testing than the allocated time, it is not possible to build this amount.

<h3>What is a system of equations?</h3>

A system of equations is when two or more variables are related, and equations are built to find the values of each variable.

In this problem, the variables are:

  • Variable c: number of child bikes.
  • Variable a: number of adult bikes.

Each child bike requires 4 hours to build, as do each adult bike. The company has 100 hours of testing, hence:

4c + 4a = 100.

c + a = 25.

With 20 child bikes and 6 adult bikes in a week, we have that c = 20, a = 26, hence:

c + a = 26

20 child bikes and 6 adult bikes would require more testing than the allocated time, it is not possible to build this amount.

More can be learned about a system of equations at brainly.com/question/24342899

#SPJ1

4 0
2 years ago
Other questions:
  • A car travels at an average speed of 48 miles per hour. how many miles does it travel in 4 hours and 45 minutes?
    12·1 answer
  • Given f(x)=2x + 5 and g(x)=x^2 - 3<br><br> f(3)=<br> g(2)=<br> g(f(-1))=<br> f(g(-1))=<br> g(f(x))=
    10·1 answer
  • A summer camp has divided its campers into 8 groups of 9 campers.How many campers are at the summer camp?
    14·2 answers
  • PLEASE ANSWER ONLY IF U ARE RIGHT ILL GIVE BRAINLIEST A THANKS AND 5 STARS TO U!
    14·1 answer
  • How many times larger is 3 x 10^-5 than 6 x 10^-12?
    6·1 answer
  • Help asap this is due tonight
    8·1 answer
  • If the pressure is 6 pounds per inch when the temperature is 440 F, find the pressure exerted when the temperature of the gas is
    15·1 answer
  • How would you put that in an equation?
    9·1 answer
  • 1. <br> Which is the graph of the exponential function y = 0.5(0.5)x?
    12·1 answer
  • A rectangle has a width of 15 and a length of 18. Find its area.
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!