Answer: I would say 5 days.
Step-by-step explanation:
I added both days together and divided by 2 because there are two individuals working on 20 trees and divided equally it would be 10 and it would take 5 days because that’s half.
-2r+3≥19
-2r≥16
r≤-8
second one
Answer:
Step-by-step explanation:
D=106
E=54
F=20
D is an AEA im pretty sure meaning itʻll be equal to 106
E Is a vertical angle to 54
and for F everything will equal to 180 so 180-106-54=20
I hope this helps have a good day!
Answer:
k = 5 and (6,2).
Step-by-step explanation:
Since (1,-1) is a solution of the equation 3x - ky = 8, so the point (1,-1) will satisfy the equation above.
Hence, putting x = 1 and y = -1 in the equation will give left-hand side = right-hand side.
So, 3(1) - k(-1) = 8
⇒ 3 + k = 8
⇒ k = 5 (Answer)
Therefore, the equation of the straight line is 3x - 5y = 8 ....... (1)
Now, putting x = 6 , then from equation (1) we get y = 2
Therefore, (6,2) is also a point on the graph of equation (1). (Answer)
The factors of the quadratic equation are (x+3) and (x-15).
<h2 /><h2>Given to us</h2>
<h3>To find</h3>
The factors of
.
<h3 /><h3>Solution</h3>

As we can see in the quadratic equation the value of ac is -45x². therefore, we need to divide -12x into two parts such that their sum must give -12x and their product gives us -45x².
therefore, dividing -12x into -15x and 3x,

Taking common out,

Hence, the factors of the quadratic equation are (x+3) and (x-15).
Learn more about quadratic equations:
brainly.com/question/2263981