Answer:
The constant force exerted on the ball by the wall is 119.68 N.
Step-by-step explanation:
Consider the provided information.
It is given that the mass of the ball is m = 2.2 kg
The initial velocity of the ball towards left is 7.4 m/s
So the momentum of the ball when it strikes is = 
The final velocity of the ball is -6.2 m/s
So the momentum of the ball when it strikes back is = 
Thus change in moment is: 
The duration of force exerted on the ball t = 0.25 s
Therefore, the constant force exerted on the ball by the wall is:

Hence, the constant force exerted on the ball by the wall is 119.68 N.
To solve each question, all you've got to do is add the two numbers together and then graph the result on the number line.
1.) -3 +(-1.5)
Add 3 to -1.5. It would be the same as subtracting 1.5 from -3(-3 - 1.5)
Final Answer: -4.5<span>
Or, since you are using a number line, start on -3 and go left 1.5 units and you will land on the -4.5 point. You go to the left because you are adding a negative number..
</span>
2.) 1.5+3.5
Add<span>
Final Answer: 5
</span>Or, since you are using a number line, start on 1.5 and go to the right 3.5 and you will land on 5. You go to the right because you are adding a positive number.<span>
</span>3.) 1/4 + 1/2
Multiply 1/2 by 2 to make both fractions have the same denominator
1/4 + 2/4
Add<span>
Final Answer: 3/4
</span>Or, since you are using a number line, start on 1/4 and go up 2/4 and you will land on 3/4 as the result.<span>
</span>4.) -1 1/2 + (-1 1/2)
Add -1 1/2 to -1 1/2. This would be the same as subtracting 1 1/2 from -1 1/2(-1 1/2 - 1 1/2)<span>
Final Answer: -3
</span><span>Or, since you are using a number line, start on -1 1/2 and go to the left 1 1/2 and you will land on the -3 point.</span>
Answer:
19.64
the permieter is 5 so 5/2=2.5 2.5x2.5=6.25 6.25x3.14=19.64
Answer:
D. scalene triangle
Step-by-step explanation:
This triangle has sides that all have different lengths. Therefore, this triangle is a scalene triangle.
Tips:
Isosceles triangle - two sides have equal lengths
Equilateral triangle - all three sides have equal lengths
I hope this helped! :)
9.28 days are taken to completely fill the pool
It is given that one pipe can fill the pool in 10 days
the other pipe can fill it in 25 days.
if no sewage is added, waste removal will empty the pool in 31 days.
The amount filled by pipe one in 1 day=1/10
The amount of pool filled by second pipe in 1 day=1/25
The waste removal pipe's work in 1 day= 1/31
Therefore, the work done together by all pipes in one day=1/10+1/25-1/31
= (775+310-250)/31*25*10=835/7750
Therefore, number of days taken to empty the pool= 7750/835=9.28 days
As half day cannot be counted, hence 9.28 days are taken to completely fill the pool
Disclaimer: The waste removal pipe has also been taken into consideration
For further reference:
brainly.com/question/13736913?referrer=searchResults
#SPJ9