Answer:
340
Step-by-step explanation:
The first step is finding the percentage of those who fail within 19 months.
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

The proportion is the pvalue of Z when X = 19. So



has a pvalue of 0.6808.
Jolt is expected to replace 0.6808 of the connectors sold. Out of 500, that is, on average, 0.6808*500 = 340.
Jolt expects to replace, on average, 340 of the connectors sold.
I hope this helps you
O/360.2pi.19=4
O/180.3,14.19=4
O=12.0°
Parallel lines have the same gradient.
The equations are either in the form y = mx+b (m is the gradient)
or in general form ax + by + c = 0 (-a/b)
The gradient of y = 2x - 4 is 2.
The answer is B (gradient = -4/-2 = 2)
You could cross cancel the a and your final answer would be 5/11
Answer:
The answer is below
Step-by-step explanation:
The ratio of Keith's height and his nephew's height is 15:7. Let keith height be x cm and his nephews height be y cm.

Keiths height increased by 16% , therefore Keith new height is (100% + 16%) × x = 1.16x
The nephew height is doubled, therefore his new height is 2y.
Given that Keith is now 34 cm taller than his nephew
1.16x = 2y + 34
but x = (15/7)y

The nephews new height = 2y = 2(70) = 140 cm
Keith new height = 2y + 34 = 140 + 34 = 174 cm
Their total current height = 140 cm + 174 cm = 314 cm