Answer:
If Nathan's additional injuries were severe, then Sam is probably liable for negligence.
Explanation:
There is no law that forces someone to help another person in peril, you have the legal obligation to call for help (usually 911), but your obligation ends there. If you decide to help someone, then you are responsible for that person's well being and must exercise reasonable care. Even if you are not a properly trained rescuer, you have the obligation to not make the victim worse. If Nathan's health suffered due to Sm's negligence, then Sam is liable to him.
This is a reason why you have to think twice before assisting someone in peril since once you decide to be a rescuer, then you are liable for any bad consequences that may occur. For example, if you are trying to help someone out of a car after an accident, an that person's leg or arm is broken in the process, then you may be liable for it.
Answer:
$3200
Explanation:
Net worth is the value of an individual's or an organization's assets after subtracting liabilities. Net worth is, therefore same as net assets.
Nika's net worth is the value of her assets minus liabilities. Assets being the things she owns, while liabilities are what she owes.
Nika's assets = Cars $3400, cash $400,
Total assets = $3,800
Liabilities = car debts $600
Net worth =$3800 -$600
=$3200
Answer:
B, Less hands on creative work
Explanation:
When a graphic designer is promoted to the position of Art director, he/she has has reduced the number of hands on creative work. This is because it is the job of graphic designers to come up with the actual designs while the Art director is the overall head of the design department as he maps out and approves the designs of the graphic designers.
Although, to become an Art director, one must have the basic knowledge of graphic design.
Art directors usually work with the graphic designers to ensure that they do a good job and most importantly present the designs for approval.
Cheers.
Answer: CPM and PERT use different activity time estimates.
Explanation:
Program (Project) Management and Review Technique (PERT) is appropriate when the project time needed to complete different activities are unknown while the Critical Path Method or CPM is fitted for recurring projects in nature. PERT deals with activities that are not predictable but CPM deals with repetitive activities. PERT focuses/concentrates on time while CPM focuses on time-cost & trade-off. Also, PERT requires three-time estimate while CPM requires one-time estimate. PERT uses a probabilistic model and on the other hand, CPM uses a deterministic model. In PERT, a technique of planning and controlling time is used but CPM uses a technique to control cost and time.
To conduct a systematic random sampling out of the population, one should follow the following steps:
1. Create a list and assign numbers on every element in the population
- Say a we assign cases 1 to 12,000
2. Decide the sample desired sample size
- In our case, the sample size required is 600 cases
3. Select sampling interval
- Simply divide the population with the sample size
- 12,000/600 =20
- Therefore, our sampling interval is 20. Meaning on every 20th element on the population we get to draw our pick until the desired sample size is accomplished.