Answer:
= 426 1/4 hr.
Step-by-step explanation:
5 1/2 = 5.5 Days in a week
7 3/4 = 7.75 hr. Per Day
Total hours in a week = 5.5 × 7.75 = 42.625 hr in a week
In 10 weeks = 42.625 × 10 = 426.25 hr.
Answer:
vertex = (- 1, 3 )
Step-by-step explanation:
Given a parabola in standard form
y = ax² + bx + c ( a ≠ 0 )
Then the x- coordinate of the vertex is
= - 
y = 2x² + 4x + 5 ← is in standard form
with a = 2, b = 4, then
= -
= - 1
Substitute x = - 1 into the equation for corresponding value of y, that is
y = 2(- 1)² + 4(- 1) + 5 = 2 - 4 + 5 = 3
vertex = (- 1, 3 )
Yes, adding going up one every time, 5,6,7,8
Is the 10 taking away 5 or was it meant to me 10.5 ?
Answer:
y ≤ –2x + 3
Step-by-step explanation: i got it right on edge 2020