Answer:
how big is the project
Step-by-step explanation:
Answer:
a) 395.725
b) 378.75
c) 8.8
Step-by-step explanation:
a) S(8.5) = 11.25(8.5) + 300 = 395.625
b) if she worked 47 hrs, that means there were 7 overtime, h=7 and we have to find S(7).
S(7) = 11.25(7) + 300 = 378.75
c) her salary was 398.61, that means S(h) = 398.61 and we have to find h.
398.61 = 11.25(h) + 300
98.61 = 11.25(h)
h = 98.61 / 11.25
h= 8.8
This is not a quadratic equation.
It is a cubic equation.
X1 = 4
X2 = -5
X3 = -4
Answer: 3.14 *16.8*16.8*16.9=14977.3478
14977.3478= 14,977.35
Answer:
5r^2+2
Step-by-step explanation:
(4r^2 – 3r + 2) – (-r^2 – 3r) =
Distribute the minus sign
(4r^2 – 3r + 2) +r^2 + 3r =
Combine like terms
(4r^2 + r^2 – 3r+ 3r + 2) =
5r^2+2