Answer: Red copper = $0.12 per meter
Yellow copper = $0.22 per meter
Step-by-step explanation:
Since Red copper costs $0.90 for 7.6m, the cost of 1m of red copper will be:
= $0.90/7.6
= $0.12
Since yellow copper costs $1.12 5.2m, the cost of 1m of yellow copper will be:
= $1.12 / 5.2
= $0.22 per meter
The new a=plot would be:
(-3-9,2-8)=
Answer:
I think it's 7- 2i over 3. hopefully that helps