Answer:
24
Step-by-step explanation:
.5 min = 12 pancakes
1 min = 24 pancakes
1.5 min = 36 pancakes
Answer:
80 cars will maximize revenue
Step-by-step explanation:
The revenue per square meter for parked cars is ...
$2.00/5 = $0.40
The revenue per square meter for buses is ...
$6.00/32 = $0.1875
Thus the available space should be used to park the maximum number of cars.
80 cars should be in the lot to maximize income.
6c + 3t = 4800
8c + t = 4600 .....multiply by -3
----------------
6c + 3t = 4800
-24c - 3t = - 13800
---------------add
-18c = - 9000
c = -9000/-18
c = 500...so each car is 500
8c + t = 4600
8(500) + t = 4600
4000 + t = 4600
t = 4600 - 4000
t = 600...and each truck is 600
selling 2 cars and 3 trucks...
2(500) + 3(600) = 1000 + 1800 = 2800 <==
Answer:
Yes
Step-by-step explanation:
Traveling 100km/hrs and have quarter of an hour to reach destination. Quarter of a 100 is 25km meaning u can travel 25 km in 15 min. so 16 km can be reached in 9.6 minutes
Answer:
Min: 32
Lower Quartile: 36
Median: 42
Upper Quartile: 47
Max: 53
Interquartile: 11
Step-by-step explanation:
The min. is just the lowest number. The lower quartile is the number in the middle of the numbers below 42, the median is the number in the very middle, the upper quartile is the middle number above 41 and the interquartile is the upper quartile minus the lower quartile.