9/10 = z/8
cross multiply
9/10(10)(8) = z/8(8)(10)
9(8) = z(10)
72 = 10z
Isolate the z, divide 10 from both sides
72/10 = 10z/10
z = 72/10
z = 7.2
7.2, or D) is your answer
hope this helps
Answer: No
Step-by-step explanation:
Answer:
H0: μ = 8.3 hours
Ha: μ > 8.3 hours
We need to remember that a type of error II if the error associated when we NO reject the null hypothesis when actually the alternative hypothesis is true. And is also known as false negative. The best answer for this case would be:
D. The manufacturer will decide the mean battery life is 8.3 hours when in fact it is greater than 8.3 hours.
Since we are FAILING to reject the null hypothesis when the true mean is actually higher than the value specified
Step-by-step explanation:
For this case we want to determine if mean running time has increased as a result of the new change so then the system of hypothesis are given by:
Note: we assume that the value to check in order to be consistent with the options is 8.3
H0: μ = 8.3 hours
Ha: μ > 8.3 hours
We need to remember that a type of error II if the error associated when we NO reject the null hypothesis when actually the alternative hypothesis is true. And is also known as false negative. The best answer for this case would be:
D. The manufacturer will decide the mean battery life is 8.3 hours when in fact it is greater than 8.3 hours.
Since we are FAILING to reject the null hypothesis when the true mean is actually higher than the value specified
Decimal i know this because of the dot also known as a decimal
Answer:
Number of pizza deliver on Saturday = 14 pizza
Step-by-step explanation:
Given:
Number of delivery day (Friday, Saturday) = 2
Number of pizza deliver on Friday = 8
Average of delivery (Mean) = 11 pizza
Find:
Number of pizza deliver on Saturday
Computation:
Mean = Sum of pizza / Number of delivery day
11 = [8 + Number of pizza deliver on Saturday] / 2
22 = 8 + Number of pizza deliver on Saturday
Number of pizza deliver on Saturday = 22 - 8
Number of pizza deliver on Saturday = 14 pizza