1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
mash [69]
3 years ago
7

3. A clothing manufacturing company makes two types of jogging pants, design A and design B. the design A jogging pants sells to

the retail stores for Php2500 each and the design B jogging pants for Php2100. The cost for manufacturing each design A is Php1750 and the cost of each design B is Php1200. If the company makes no more than 120 jogging pants a week and budgets no more than Php150000 per week, how many of each type should be made to maximize profit?
Mathematics
1 answer:
andriy [413]3 years ago
3 0

Answer:

z(max) =  256000  Php

x₁ = 10

x₂ = 110

Step-by-step explanation:

Jogging pants design                Selling Price       Cost    

weekly production

 Design A    x₁                                     2500            1750

  Design B    x₂                                    2100            1200      

1. z ( function is : )

z = 2500*x₁  +  2100*x₂       to maximize

First constraint weekly production

 x₁    +   x₂    ≤  120

Second constraint Budget

1750*x₁  +  1200*x₂   ≤   150000      

Then the model is

z = 2500*x₁  +  2100*x₂       to maximize

Subject to

 x₁    +   x₂    ≤  120

1750*x₁  +  1200*x₂   ≤   150000  

General constraints   x₁  ≥  0           x₂   ≥ 0            both integers

First table

z           x₁           x₂        s₁       s₂      cte

1       -2500      -2100    0       0         0

0          1              1          1        0  = 120

0      1750         1200     0       1   = 150000

Using AtoZmath online solver and after 6 iterations the solution is:

z(max) =  256000  Php

x₁ = 10

x₂ = 110

You might be interested in
Adele made cupcakes and cookies. The number of cookies she made is five times as many as the number of cupcakes she made.
zlopas [31]

Answer:

A. 190/5.

Step-by-step explanation:

Adele made 190 cookies, which is five times the amount of cupcakes she made. To find the amount of cupcakes she made, we must divide 190 by 5. By doing this we get the answer: 38 cupcakes.

Hope this helps! Let me know!

7 0
3 years ago
What is the area of a sector with radius 6" and measure of arc equal to 120°?
fenix001 [56]
The area of a sector = 0.5 * radius^2 * central angle measure (in radians)

So that:

Area_{sector}=  \frac{1}{2} * 6^2* \frac{120}{180}*\pi=12\pi=37.69911
\\
Area_{sector}=37.7 sq in

7 0
3 years ago
Answer this question​
MAVERICK [17]

Answer:

c. 40°

Step-by-step explanation:

The information given has been illustrated in the figure drawn in the attachment below.

m<BAD = 50° (angle bisector theorem)

m<ADB = 90° (perpendicular bisector)

m<ABD = 180 - (m<BAD + m<ADB) (sum of angles in a triangle)

m<ABD = 180° - (90° + 50°)

= 180° - 140°

= 40°

B = 40°

4 0
3 years ago
Solve for the indicated variable (y) <br> 9x+y=7
Gnesinka [82]
1. Slope=9
2. x-intercept = 7/9 = 0.77778
3. y-intercept = 7/-1= -7.00000
Rearrange the equation by subtracting what is to the right of the equal sign from both sides of the equation: 9*X-Y-(7)=0
Hope this helps
7 0
3 years ago
I need help with this my guys !
luda_lava [24]

Answer:

1/2

Step-by-step explanation:

Slope = rise/run

Rise=1

Run=2

Rise/run=1/2

4 0
3 years ago
Read 2 more answers
Other questions:
  • Anna is selling tickets to the school's gymnastics competition. On the first day, she sells 5 adult tickets and 6 child tickets
    15·2 answers
  • A bicycle store costs ​$3850 per month to operate. The store pays an average of ​$40 per bike. The average selling price of each
    13·2 answers
  • Find the area of the ring-the shaded region
    9·1 answer
  • Find three consecutive odd integers who sum is 13 more than twice the largest of the three integers
    8·1 answer
  • Hi what is the circumstances 3rd to be ​
    14·1 answer
  • Please help me on this problem!​
    8·1 answer
  • Giải phương trình : 8cos 4 x – 4cos2x + sin4x – 4 = 0
    15·1 answer
  • What is the solution for this system x+y=6 2x+4y=20
    13·1 answer
  • A construction company is analyzing which of its older projects need renovation. Building B was built two years before building
    8·1 answer
  • 2 ACTIVITY: Estimating a Whole
    7·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!