Answer:
1 hour and 7.5 minutes
Step-by-step explanation:
We have the following information:
Jose makes 1 / 1.5 of the job per hour. It is his rate of work in addition to that the partner makes 1 / 4.5 of the job per hour. It is his rate of work.
Thus:
1 / 1.5 + 1 / 4.5 = 1 / x
0.8898 = 1 / x
x = 1 / 0.8888
x = 1.125
Hence, it will take 1 hour and 7.5 minutes for them to complete the job working together.
42.5 units sq
I’m not sure because I did this partly in my head but this should be right.
Complete question :
Point K on the number line shows Kelvin's score after the first round of a quiz: A number line is shown from negative 10 to 0 to positive 10. There are increments of 1 on either side of the number line. The even numbers are labeled on either side of the number line. Point K is shown on 3. In round 2, he lost 9 points. Which expression shows how many total points he has at the end of round 2? 3 + (−6) = −9, because −9 is 6 units to the left of 3 3 + 6 = −9, because −9 is 6 units to the left of 3 3 + (−9) = −6, because −6 is 9 units to the left of 3 3 + 9 = −6, because −6 is 9 units to the left of 3
Answer: 3 + (−9) = −6, because −6 is 9 units to the left of 3
Step-by-step explanation:
Given the following :
Width of number line = - 10 to + 10
Point K on the number line = +3 ( kelvin's score after the first round of quiz).
If Kelvin losses 9 points in round 2 = - 9
Hence at the end of round 2, He'll have a total of :
Point at the end of round 1 + point lost in round 2
3 + (-9) = - 6
Answer:
x=12
Step-by-step explanation:
you just have to add 2 to both sides to get x by itself and 10+2=12. therefore, x=12
Step-by-step explanation:
open brackets and work out